BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 23, 2024 at 8:00 PM

Updated November 8, 2024

Site work and paving for a mixed-use development in Manhattan Beach, California. Working plans call for site work for a water / sewer project.

**As of October 23, 2024 this project has been postponed. As of this time it is unknown if and when project will rebid. Bid Valid 90 Days Liquidated Damages $1,000 Per Day Estimated Bid Value $390,000 Start/Delivery Date December 2024 Project Duration 45 total working days (which exclude weekends and City Holidays), including pre-construction requirements. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Q&A Deadline 08/28/2024 11:00 AM (PDT) Any Bidder that is in doubt as to the intended meaning of any part of the Contract Documents, or that finds discrepancies in or omissions from the Contract Documents, may submit to the City Engineer a written request for an interpretation or correction not later than the date specified in the Notice Inviting Bids. Requests for clarification received after this date will be disregarded. Please indicate the Project and identification number in the request for clarification. Telephonic requests will not be taken. Online Q&A Yes The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of BIDS. Actual quantities of Work to be performed may vary at the discretion of the City Engineer. The Cycle 3 Sewer Improvements Project (E1297-24C) is a Public Works construction project to repair or replace seven (7) segments of pipe on 7th St, 18th St, 19th St, Highview Ave, within an easement between 36th Pl and Rosecrans Ave, and in Polliwog Park. A sewer manhole lid will also be replaced in Manhattan Village. The work includes, but is not limited to, replacing 260 linear feet (LF) of 8" VCP sewer main, installing 741 LF of CIPP liner, spot repairing/replacing 42 LF of 6" VCP sewer main, spot repairing/replacing 6-16 LF of 18" VCP sewer main with 18" RCP (Class IV) and concrete collar joints, installing four 4' diameter sewer manholes, 8 sewer main spot repairs, constructing 1 ADA ramp, reconnecting sewer laterals and manholes, installing sewer lateral top hats, sheeting, shoring, bracing, pre-construction and post-construction CCTV inspection of sewer main, sewer bypass pumping, repairing 3635 sq. ft. of AC pavement, remove/replace curb and gutter, sidewalk, walkway, driveway, pavers, bollards, striping, marking and markers, restoring water meters and valves, restoring property owner landscape, hardscape, walkways, patios, and implementing traffic control measures. REQUIRED GOAL: REUSE OR RECYCLE A MINIMUM OF 65% OF ALL PROJECT WASTE

Final Planning

Water / Sewer

$390,000.00

Public - City

Paving, Site Work

13

12

5

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Site Maintenance, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Storm Drainage, Sump Pumps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
101
Bidding Soon
1,988
All Active Projects
830
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2024

March 5, 2025

img_map_placeholder

Multiple Locations, Manhattan Beach, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.