Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published October 23, 2024 at 8:00 PM
Updated November 8, 2024
Site work and paving for a mixed-use development in Manhattan Beach, California. Working plans call for site work for a water / sewer project.
**As of October 23, 2024 this project has been postponed. As of this time it is unknown if and when project will rebid. Bid Valid 90 Days Liquidated Damages $1,000 Per Day Estimated Bid Value $390,000 Start/Delivery Date December 2024 Project Duration 45 total working days (which exclude weekends and City Holidays), including pre-construction requirements. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Q&A Deadline 08/28/2024 11:00 AM (PDT) Any Bidder that is in doubt as to the intended meaning of any part of the Contract Documents, or that finds discrepancies in or omissions from the Contract Documents, may submit to the City Engineer a written request for an interpretation or correction not later than the date specified in the Notice Inviting Bids. Requests for clarification received after this date will be disregarded. Please indicate the Project and identification number in the request for clarification. Telephonic requests will not be taken. Online Q&A Yes The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of BIDS. Actual quantities of Work to be performed may vary at the discretion of the City Engineer. The Cycle 3 Sewer Improvements Project (E1297-24C) is a Public Works construction project to repair or replace seven (7) segments of pipe on 7th St, 18th St, 19th St, Highview Ave, within an easement between 36th Pl and Rosecrans Ave, and in Polliwog Park. A sewer manhole lid will also be replaced in Manhattan Village. The work includes, but is not limited to, replacing 260 linear feet (LF) of 8" VCP sewer main, installing 741 LF of CIPP liner, spot repairing/replacing 42 LF of 6" VCP sewer main, spot repairing/replacing 6-16 LF of 18" VCP sewer main with 18" RCP (Class IV) and concrete collar joints, installing four 4' diameter sewer manholes, 8 sewer main spot repairs, constructing 1 ADA ramp, reconnecting sewer laterals and manholes, installing sewer lateral top hats, sheeting, shoring, bracing, pre-construction and post-construction CCTV inspection of sewer main, sewer bypass pumping, repairing 3635 sq. ft. of AC pavement, remove/replace curb and gutter, sidewalk, walkway, driveway, pavers, bollards, striping, marking and markers, restoring water meters and valves, restoring property owner landscape, hardscape, walkways, patios, and implementing traffic control measures. REQUIRED GOAL: REUSE OR RECYCLE A MINIMUM OF 65% OF ALL PROJECT WASTE
Final Planning
Water / Sewer
$390,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 04 - Masonry
Division 08 - Openings
Division 09 - Finishes
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 19, 2024
March 5, 2025

Multiple Locations, Manhattan Beach, CA
Related To This Project
Manhattan Beach, CA
Bid Date: Nov 14 2024
Manhattan Beach, CA
Bid Date: Nov 04 2024
Manhattan Beach, CA
--
Manhattan Beach, CA
--
Manhattan Beach, CA
--
Manhattan Beach, CA
Bid Date: Sep 12 2024
Manhattan Beach, CA
Bid Date: Dec 05 2024
Manhattan Beach, CA
--
Manhattan Beach, CA
--
Manhattan Beach, CA
Bid Date: May 23 2024
Vehicle, Parking and Pedestrian Sign Improvements Project, Wayfinding Sign Program Phase I - 5407409
Manhattan Beach, CA
Bid Date: May 29 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Find. Bid. Win. Your Next Project Starts Here.
ConstructConnect gives you the tools to search, analyze, and bid on verified commercial projects before your competition. Explore detailed project data, bidding timelines, and contact info—right when you need it.
Sign up now to get free company and project data instantly. No payment required.
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.