Site work and paving for a mixed-use development in Manhattan Beach, California. Completed plans call for site work for a water / sewer project.

Bid Valid 90 Days Liquidated Damages $1,000 Per Day Estimated Bid Value $390,000 Start/Delivery Date December 2024 Project Duration 45 total working days (which exclude weekends and City Holidays), including pre-construction requirements. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Q&A Deadline 08/28/2024 11:00 AM (PDT) Any Bidder that is in doubt as to the intended meaning of any part of the Contract Documents, or that finds discrepancies in or omissions from the Contract Documents, may submit to the City Engineer a written request for an interpretation or correction not later than the date specified in the Notice Inviting Bids. Requests for clarification received after this date will be disregarded. Please indicate the Project and identification number in the request for clarification. Telephonic requests will not be taken. Online Q&A Yes The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of BIDS. Actual quantities of Work to be performed may vary at the discretion of the City Engineer. The Cycle 3 Sewer Improvements Project (E1297-24C) is a Public Works construction project to repair or replace seven (7) segments of pipe on 7th St, 18th St, 19th St, Highview Ave, within an easement between 36th Pl and Rosecrans Ave, and in Polliwog Park. A sewer manhole lid will also be replaced in Manhattan Village. The work includes, but is not limited to, replacing 260 linear feet (LF) of 8" VCP sewer main, installing 741 LF of CIPP liner, spot repairing/replacing 42 LF of 6" VCP sewer main, spot repairing/replacing 6-16 LF of 18" VCP sewer main with 18" RCP (Class IV) and concrete collar joints, installing four 4' diameter sewer manholes, 8 sewer main spot repairs, constructing 1 ADA ramp, reconnecting sewer laterals and manholes, installing sewer lateral top hats, sheeting, shoring, bracing, pre-construction and post-construction CCTV inspection of sewer main, sewer bypass pumping, repairing 3635 sq. ft. of AC pavement, remove/replace curb and gutter, sidewalk, walkway, driveway, pavers, bollards, striping, marking and markers, restoring water meters and valves, restoring property owner landscape, hardscape, walkways, patios, and implementing traffic control measures. REQUIRED GOAL: REUSE OR RECYCLE A MINIMUM OF 65% OF ALL PROJECT WASTE

Post-Bid

Water / Sewer

$390,000.00

Public - City

Paving, Site Work

13

12

5

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
487
Active Projects
232
Bidding Soon
3,813
All Active Projects
1,719
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 19, 2024

October 21, 2024

December 23, 2024

img_map_placeholder

Multiple Locations, Manhattan Beach, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.