Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Tucson, Arizona. Working plans call for the renovation of a municipal facility.
As of September 13, 2024, This solicitation was canceled. The State will look for other means of procuring this work. Questions Due: August 9, 2024 5:00pm Arizona Time PROJECT DESCRIPTION: Scope of work includes the replacement of (1) air handler unit (AHU) with the addition of an economizer, with existing AHU controls to be replaced. Modifications to the existing hydronic piping to be included. Existing duct alterations to be kept to a minimum. Pipe fitting insulation, HVAC duct seam tape, expansion joints, duct seam mastic contain asbestos material abatement will be required. The air handling unit will necessitate modifications to the existing fire alarm system. Fire alarm integration items include, but are not limited to, air handling unit shutdown (both fans) and operation of the new fire/smoke dampers at the unit inlet and outlet (not within the scope of this design package). This project will also include 2 alternates for separate contractor pricing. Alternate #1 involves the removal of 2 abandoned in place boilers and associated flue and piping. To ensure optimal efficiency and potentially reduce project costs (Alternate #2), the State seeks bids for construction schedules that prioritize milder climate months. Alternate #2 involves providing temporary cooling, heating, and ventilation via a rental air handler to be used while the building system is out of service. This project will require the contractor to remove existing air handler unit (AHU). Provide new air handling units fabricated and shipped according to a delivery schedule defined by the ADOA. Unit will be complete including equipment and accessories as described with design package specifications and equipment schedules and carry a 2-year warranty. Fabricate and ship units in multiple sections as indicated on the drawings and as required by shipping limitations to facilitate rigging and installation. The most constraining portion of the installation pathway is believed to be on the order of 70"x80". Contractor shall field verify and communicate to the AHU manufacture all concerned site constraints. The manufacturer shall select AHU arrangements, shipping splits, and knockdown construction requirements to allow passage within these constraints. Contractor shall be responsible for all labor associated with the disassembly and reassembly of the air handling unit. Ductwork cleaning and new filter will be in place prior to any operation of units. The contractor will provide the services of a factory authorized service technician to assist the installing contractor with startup services and instruct the contractor and owner's personnel in the maintenance and use of the equipment. Contractor will provide double wall construction with a minimum 16-gauge exterior and 20-gauge interior. Panels to be bolted standing seam. Contractor shall field test each air handling unit for leakage per the requirements described in specifications and drawings. Also testing, adjusting and balancing will be required.
Final Planning
Municipal
$391,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 15, 2024
March 13, 2025
416 W Congress St, Tucson, AZ
Related To This Project
Tucson, AZ
--
Tucson, AZ
Bid Date: Sep 16 2024
Tucson, AZ
Bid Date: Aug 06 2024
Tucson, AZ
Bid Date: Aug 16 2024
Tucson, AZ
Bid Date: Aug 28 2024
Tucson, AZ
Bid Date: Aug 27 2024
Tucson, AZ
Bid Date: Sep 12 2024
Tucson, AZ
Bid Date: Sep 06 2024
Tucson, AZ
Bid Date: Aug 29 2024
Tucson, AZ
Bid Date: Aug 15 2024
Tucson, AZ
--
Tucson, AZ
Bid Date: Aug 08 2024
Tucson, AZ
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.