BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Bethel, Vermont. Completed plans call for site work for a playground / park / athletic field; and sidewalk / parking lot.

Description Revised and re-issued. 3,000, 5 wide pathway built to accessibility standards around the existing Bethel Athletic Fields. Question Deadline 08/11/2024 Chris Fors, Vermont Outdoor Recreation Economic Collaborative (VOREC) Project Manager, 802-299-9889, wcfors@gmail.com. All questions concerning this Request For Proposals (RFP) shall be forwarded to the contact person via email no later than five days prior to the due date listed above All work on the above listed project must be completed by November 1, 2025. The right to accept or reject any or all proposals in whole or in part. DESCRIPTION/REQUIREMENTS/MINIMUM SCOPE OF WORK: An approximately 3,000 foot long, 5 foot wide pathway built to accessibility standards, linking existing sports fields and parking areas at the Bethel Athletic Fields: This project will occur on school lands and private parcels owned by Dennis M. Wood and GW Nolato, Inc. Ten year trail use agreements have been secured from each landowner per state grant requirements. This project is located within the Town of Bethel Floodplain Overlay District and within the mapped Flood Hazard Area. A Town Zoning Permit with the following project conditions has been secured: 1. Nodisplacement of land subject to flooding will occur. All sod and organic soils removed from the pathway route will be removed from the flood hazard area. 2. The proposed pathway will be constructed entirely within the previously developed portion of the site. 3. The pathway will be level with the existing mowed grass surface and will not impede the inflow or retreat of floodwaters. 4. All sections of the pathway will be more than 35 feet from the existing riverbank, with the majority of the pathway being set back well in excess of the 35 minimum required streambank setback. 5. The section of the pathway closest to the riverbank in the original design has been removed and the new pathway design has been significantly rerouted away from the riverbank.

Award

Playgrounds / Parks / Athletic Fields

$53,250.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
40
Bidding Soon
774
All Active Projects
317
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2024

October 16, 2024

img_map_placeholder

To Be Determined, Bethel, VT

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.