BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Red Lodge, Montana. Completed plans call for site work for a road / highway; and for paving for a road / highway.

1) Approximately 2 miles (10,560ft.) of 24ft. wide road, or 28,160 square yards (SY) of Chip Seal on Clear CreekRoad from the intersection of US 212 north of Roberts, to where the pavement ends approximately 100 yds. beyond the intersection of the Cherry Springs Road. 2) Approximately 1.062 Miles (5607 ft) of 27 ft. wide road, or 16,822 square yards (SY) of Chip Seal on Joliet Fromberg Road approximately 1 mile north of Fromberg where the newest asphalt begins continuing north to end of asphalt. 3) Approximately 0.72 miles (3755 ft) of 24 ft. wide road, or 10,013 square yards (SY) of Scrub Seal on Joliet Fromberg Road from the Town of Fromberg Limits to the newest asphalt listed above in #2. 4) Alternative---Fog seal 1, 2 and 3 with CSS-1H 50/50 diluted at 0.01-0.04 rate SCOPE OF WORK: The successful contractor must: 1. Remove debris from cracks, Clean and prep the road surface. 2. Chip seal using approximately .41 to .45 gallons of CHF RS-2P or equivalent emulsified asphalt and 25 lbs. / SY of 3/8 chips. 3. Shot rate and lbs. / SY may vary depending on roadway conditions. 4. Follow Montana Department of Transportation Asphalt Manual guidelines 5. Provide appropriate traffic control. 6. Removal of excess chips 7. Repaint the centerline, double yellow solid stripes. Carbon County may: 1. Stockpile 3/8" Type 2 chips for the contractor at agreed locations For any questions or site inspection call Carbon County Commissioner at 406-446- 1595. Bids must contain proof of Worker's Compensation Insurance, and Liability Insurance in the amount of at least $2,000,000. Bidders must comply with Davis Bacon Wage Rates and use taxed fuel. The successful bidder must give Carbon County at least 24 hours of notice before work begins. Carbon County reserves the right to reject any and all bids, or portions thereof. Bids will be reviewed for product quality and warranty as well as lowest bid. Successful bidder shall perform the work as soon as weather allows and before September 15, 2025 and give Carbon County at least 24 hours of notice before work begins.

Post-Bid

Roads / Highways

$889,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
52
All Active Projects
16
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2024

September 9, 2024

img_map_placeholder

Multiple Locations, Red Lodge, MT

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.