BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 8, 2025 at 8:00 PM

Updated July 9, 2025

Site work for a water / sewer project in Red Lodge, Montana. Completed plans call for site work for a water / sewer project.

**As of July 8,2025, the project was awarded to Vortex Services, with an awarded amount of $856,217.85.** Construction of the Red Lodge 16-inch Bypass Line The project consists of the installation of approximately 3,370 linear feet of 16-inch PVC water main to bypass the existing pressure reducing valve on White Ave. S. It also includes the deconstruction of the booster pumps located in the utility building near the intersection of Lazy M. St. and U.S. Highway 78.After deconstruction of the two booster pumps, the proposed pressure reducing system will have to be installed in the same building. Currently, these booster pumps are the sole source of water supply to the County Club Estates Subdivision in Red Lodge Montana. During the pumps decommission, water will have to be bypassed to supply the County Club Estates Subdivision. Each bid or proposal must be accompanied by a Certified Check, Cashier's Check, or Bid Bond payable to the City of Red Lodge, in an amount not less than ten percent (10%) of the total amount of the bid. Successful Bidders shall furnish an approved Performance Bond and a Labor and Materials Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance, as required, shall be provided by the successful Bidder(s) and a certificate(s) of that insurance shall be provided. This project is funded in part or in whole with grant/loan funding from the Montana Drinking Water State Revolving Fund (DWSRF). The right is reserved to reject any or all proposals received, to waive informalities, to postpone the award of the contract for a period not to exceed sixty (60) days, and to accept the lowest responsive and responsible bid that is in the best interest of the Owner All questions about the meaning or intent of the Contract Documents are to be submitted in writing to and must be received by Great West Engineering no later than 5 PM local time on May 5, 2025. Questions received after this date will not be answered The City of Red Lodge is an Equal Opportunity Employer

Award

Water / Sewer

$856,218.00

Public - City

Site Work

25

27

2

6

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
7
Bidding Soon
142
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

July 14, 2025

Project location map

MT-78 & Lazy M St, Red Lodge, MT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.