Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a road / highway in Paso Robles, California. Conceptual plans call for site work for a road / highway; for paving for a road / highway; and for outdoor lighting for a road / highway.
In February 2013, the City opened the Salinas Riverwalk Trail extending from Union and North River to Larry Moore Park. The trail featured both ground level and bollard lighting designed to illuminate the path for the enjoyment of both residents and visitors. The Salinas Riverwalk Trail is one of the first sections of a planned 30-mile river trail extending from Santa Margarita in the south to San Miguel in the north. The current trail section can be accessed at several points including Union Road and North River, the Navajo and Riverbank neighborhoods and Larry Moore Park. Unfortunately, immediately following opening, it became apparent that the specified lighting was not appropriate for trail conditions. Maintenance and replacement efforts over the past 11 years have not been successful. This project is intended to design and install new trail lighting that is appropriate for the conditions in order to mitigate safety concerns and encourage community recreational use. If lighting is improved, the trail will be a viable connector to future trail segments, create an attractive recreational opportunity, support public safety and improve community quality of life. As of August 23, 2024, this project is included in the city's 2024-2029 Capital Improvement Program (CIP). Construction is anticipated from 2025-2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$460,000.00
Public - City
Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2026
River Walk, Paso Robles, CA
Related To This Project
Paso Robles, CA
--
Paso Robles, CA
--
Paso Robles, CA
Bid Date: Sep 12 2024
Paso Robles, CA
--
Paso Robles, CA
--
Paso Robles, CA
--
Paso Robles, CA
--
Paso Robles, CA
--
Paso Robles, CA
--
Paso Robles, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.