BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in El Cerrito, California. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Contra Costa County Public Works Department (CCCPWD) is seeking qualified consultants to submit a technical proposal for design services associated with the San Pablo Avenue Complete Streets/Bay Trail Gap Closure Project (Project). Estimated Construction Contract Cost: $9,638,300. Anticipated Start of Construction: Summer 2027 Estimated Working Days: 120 The Project will connect the non-motorized users between the communities of Rodeo and Crockett by constructing infrastructure for bicyclists and pedestrians. The improved facilities implement the San Pablo Avenue Complete Streets Study approved by the County Board of Supervisors in June 2018. Approximately 85% of the project's total length includes the construction of an off-street shared use path between California Street in unincorporated Rodeo and Pomona Street in unincorporated Crockett. This 13,700-foot-long and 10-foot-wide path will be separated from vehicular traffic by a 3-foot-wide buffer that includes a concrete barrier for additional protection. The Project is funded by the State Active Transportation Program (ATP-state), the Federal Congressionally Directed Spending, and Local Road Funds including the West County Sub regional Transportation Mitigation Program (STMP) and Gas Tax. The design services portion of this project is not funded with federal dollars, therefore there is no applicable Disadvantaged Business Enterprise (DBE) goal. Consultants are required to follow all pertinent Local, State, and Federal laws and regulations. The proposals will be evaluated and ranked by a selection committee according to the criteria provided in this RFP. The proposals submitted in response to this RFP will be used as a basis for selecting the Consultant for this Project. Submit questions before 12:00 p.m. on Thursday, August 22, 2024. Questions received after this deadline will remain unanswered. Costs for preparation of the proposal shall be borne by the Consultants. Additionally, 650 linear feet of Class II bike lanes will be constructed between Rodeo Avenue and Parker Avenue to connect bicyclists between the shared use path at the Lone Tree Point Park along the northern side of San Pablo Avenue and existing Class II bike lanes from Parker Avenue to California Street.

Conceptual

Roads / Highways

$14,657,143.00

Public - County

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
86
Bidding Soon
1,899
All Active Projects
784
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2025

img_map_placeholder

San Pablo Ave, El Cerrito, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.