BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 11, 2024 at 8:00 PM

Updated September 12, 2024

Site work and paving for a civil project in Nampa, Idaho. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

Middleton and Linden Roundabout Project (MLR). Bids Must Be Accompanied by Bid Security in the Form of a Bid Bond, Certified Check, Cashier's Check or Cash in the Amount of 5% of the Amount of the Bid Proposal. Said Bid Security Shall Be Forfeited to the Highway District No. 4 as Liquidated Damages Should the Successful Bidder Fail to Enter Into Contract in Accordance With Their Proposal as Specified in the Instructions to Bidders. Construct a multi-lane roundabout at the intersection of Middleton Rd and Linden Rd in Caldwell, Idaho, including relocation of the Caldwell Highline Canal, 188 Lf precast 6' x 12' box culvert, roadway, irrigation, drainage, and miscellaneous other improvements. It is the Intent of These Documents to Describe the Work Required to Complete This Project in Sufficient Detail to Secure Comparable Bids. All Parts or Work Not Specifically Mentioned Which Are Necessary in Order to Provide a Complete Installation Shall Be Included in the Bid and Shall Conform to All Local, State and Federal Requirements. Highway District No. 4 Reserves the Right to Reject Any or All Proposals, Waive Any Nonmaterial Irregularities in the Bids Received, and to Accept the Proposal Deemed Most Advantageous and in the Best Interest of Highway District No.

Award

Roads / Highways

$3,937,440.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
21
Bidding Soon
315
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2024

September 23, 2024

Project location map

Linden Rd & Middleton Rd, Nampa, ID


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.