BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Dixon, California. Contact the soliciting agency for additional information.

Stevenson Bridge Road Bridge Environmental Consultant. The Cost Proposal Shall Be Submitted in a Separate Sealed Envelope, Which Will Remain Sealed Until the Consultant Proposals Have Been Evaluated and Ranked. The Consultant Shall List Its Proposed Cost for the Project for Each Task on a Cost Plus Fixed Fee Basis. The Cost Proposal Shall Be Prepared in a Format Similar to the Attached Sample. Time is of the essence in all terms and conditions of this Contract. The Consultant shall submit in writing any and all objections to the contract language within 5 working days of notification of selection. Notify the Engineer of any and all delays The Stevenson Bridge Road Bridge Rehabilitation Project is schedule for construction in Summer of 2025. The Consultant will submit all documents for the biological supplemental assessment and NEPA revalidation by November 30th, 2024. All permits are required by March 28th, 2025. Notify the Engineer of any and all delays. The contract will run through the bridge rehabilitation construction project with a proposed construction schedule of May 1st, 2025 to October 1st, 2026. Notify the Engineer of any notes, information, or items of special concern that need to be addressed during construction. The Consultant and its subconsultants shall be available for consultation during construction. Reimbursement shall be at the Consultant's hourly rate as shown in the contract. The Consultant shall be required to participate in biweekly conference calls to discuss progress of the project. The County will perform all required survey work. The Consultant shall work cooperatively with the County to determine the scope and schedule for any surveying work to be done. Federal and state laws require that the Solano County consider the impacts of transportation improvements on the environment and obtain applicable environmental resource regulatory clearances and/or permits prior to project construction. Solano County is seeking professional services for environmental surveys, assessments, reporting, permitting, construction support, and compliance with environmental regulations. The work will include development of supplement reports, field surveys, and monitoring required to successfully complete the construction of Solano County's Stevenson Bridge Road Rehabilitation Project. Stevenson Bridge was constructed in 1923. The existing structure is comprised of reinforced concrete T- beam approach spans and concrete tied arch main spans. The 296 feet long bridge is the last bridge of its kind that can be rehabilitated. Solano County is dedicated to preserving the historical interest in the Stevenson Bridge. The biological supplemental assessment will include a survey to assess habitat for Western Spadefoot Toad, Northwestern Pond Turtle, and Monarch Butterfly. Although these species were not included in the original biological assessment, these species currently have a proposed threatened or candidate species status but may be listed as threatened before project construction begins. The Biological Supplement Assessment with all completed surveys is due by November 30th, 2024. The goal for DBE participation for this contract is 9%. Participation by DBE consultant or subconsultants shall be in accordance with information contained in the Consultant Proposal DBE Commitment (Exhibit 10-01), or in the Consultant Contract DBE Information (Exhibit 10-02) attached hereto and incorporated as part of the Contract. If a DBE subconsultant is unable to perform, the Consultant must make a good faith effort to replace him/her with another DBE subconsultant, if the goal is not otherwise met. The County Reserves the Right to Reject Any Proposal Not Meeting These Criteria. The method of Contractor Selection has not been Determined at this time.

Conceptual

Bridges / Tunnels

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
54
Bidding Soon
1,683
All Active Projects
758
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2025

img_map_placeholder

Stevenson Bridge Rd, Dixon, CA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.