BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Fayetteville, Illinois. Contact the soliciting agency for additional information.

This project requires 19% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.07. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 31, 2024, at 9:00 AM at the Region Five/District Eight Office in Collinsville. The department anticipates this project will be delivered using the Construction Manager/General Contractor (CMGC) method as defined in the Departments Innovative Project Delivery (IPD) Manual and Guidelines. The Consultant will have the role of Engineer of Record (EOR). Refer to the IPD Manual and Guidelines for defined roles and responsibilities under the CMGC delivery method. Springfield. Phase II engineering services are required for the replacement of the structure carrying IL Route 4/15 over the Kaskaskia River in Fayetteville. This structure will be constructed on new alignment. This project will also include the modification or replacement of the adjacent two overflow structures carrying IL Route 4/15 over the Kaskaskia River overflow channels. The completion date for this contract will be 60 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Structures (Highway: Advanced Typical) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 46 - RFQ - Route 4/15 Over the Kaskaskia River in Fayetteville, Phase II Project

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
43
Bidding Soon
790
All Active Projects
303
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2025

img_map_placeholder

State Rte 4, Fayetteville, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.