Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Fayetteville, Illinois. Contact the soliciting agency for additional information.
This project requires 19% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.07. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 31, 2024, at 9:00 AM at the Region Five/District Eight Office in Collinsville. The department anticipates this project will be delivered using the Construction Manager/General Contractor (CMGC) method as defined in the Departments Innovative Project Delivery (IPD) Manual and Guidelines. The Consultant will have the role of Engineer of Record (EOR). Refer to the IPD Manual and Guidelines for defined roles and responsibilities under the CMGC delivery method. Springfield. Phase II engineering services are required for the replacement of the structure carrying IL Route 4/15 over the Kaskaskia River in Fayetteville. This structure will be constructed on new alignment. This project will also include the modification or replacement of the adjacent two overflow structures carrying IL Route 4/15 over the Kaskaskia River overflow channels. The completion date for this contract will be 60 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Structures (Highway: Advanced Typical) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 46 - RFQ - Route 4/15 Over the Kaskaskia River in Fayetteville, Phase II Project
Conceptual
Roads / Highways
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 21, 2025
State Rte 4, Fayetteville, IL
Related To This Project
Fayetteville, IL
Bid Date: Sep 10 2024
Fayetteville, IL
Bid Date: Jun 27 2024
Fayetteville, IL
--
Fayetteville, IL
Bid Date: Dec 04 2023
Fayetteville, IL
--
Fayetteville, IL
Bid Date: Jul 15 2020
Fayetteville, IL
Bid Date: Feb 28 2023
Fayetteville, IL
Bid Date: Jun 21 2022
Alma, IL
Bid Date: Aug 16 2024
Schaumburg, IL
--
Midlothian, IL
Bid Date: Aug 12 2024
Springfield, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.