BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Marion, Illinois. Contact the soliciting agency for additional information.

https://www.wsiltv.com/news/illinois/two-construction-projects-ongoing-on-route-13/article_cebe8b8a-63f8-11ef-8af5-6bc7a337324e.html MARION, Ill. -- Drivers will be seeing a new look soon on Route 13 in Williamson County. Crews with the Illinois Department of Transportation (IDOT) began construction between Sinclair Avenue and Route 37 in Marion on August 5. Currently, construction crews are milling and paving to prepare to lay down new asphalt. IDOT officials say there is about three weeks left of construction for this section. Another road project in Carbondale is going on as well. Drivers and bike riders will soon be seeing a new path in their area. On the eastbound lanes of Route 13, starting at the intersection on Old Route 13 and new Route 13, there will be a new shared use path. This path will end at Wood Road in Murphysboro and will connect to the current one in Carbondale. This project started in July and will continue through 2025. __________________________________________________________________________________________ This project may contain Federal Funds. This project requires 24% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 30, 2024, at 10:00 AM at the Region Five/District Nine Office in Carbondale. Phase I/II engineering services are required to perform work associated with the reconstruction and resurfacing of IL 37 in Marion from Old IL 13 to north of Wildcat Dr. in Williamson County. Reconstruction of IL 37 includes pavement resurfacing, pavement patching, curb & gutter, sidewalk, bicycle accommodations, entrance and sideroad improvements, storm sewer, traffic signals, and pavement markings The completion date for this contract will be 72 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Special Studies (Location Drainage) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 52 - RFQ - Old IL 13 to North of Wildcat Drive in Marion, Phase I/II Project

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
59
Bidding Soon
842
All Active Projects
397
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 21, 2025

February 21, 2031

img_map_placeholder

IL-13, Marion, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.