This is a service / maintenance or supply contract in Morris, Illinois. Contact the soliciting agency for additional information.

This project requires 24% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 30, 2024, at 10:30 AM at the Region Two/District Three Office in Ottawa. Phase I/II engineering services are required to prepare a Project Report and Categorical Exclusion determination along with Plans, Specifications, and Estimates for reconstruction of the intersection of US 6 (E) with IL 47, just south of I-80 in Morris. The proposed work is anticipated to include reconstruction of the intersection along with geometric and safety improvements. Work may also include bicycle and pedestrian accommodations. Phase I work will include preparation of an Abbreviated Project Report, conducting route surveys, traffic studies, proposed design, crash analysis, along with review of maintenance of traffic, potential safety improvements, and bicycle and pedestrian accommodations. An intersection design study, utility coordination, preliminary cost estimates, preparing plan, profile and cross section sheets, a pavement design and life cycle cost analysis will be needed along with all other work necessary to complete the Phase I report. Phase II work will include preparation of Phase II final contract plans and special provisions. Work may include preparing roadway plans, identifying utility conflicts and relocations, preparing detailed staging and traffic control plans, participating in local agency coordination, providing quantities and detailed information to the district Estimator, and all other work necessary to complete the final contract Plans, Specifications, and Estimates. Locations, depths, and volumes of soil excavation shall be provided in the Districts format, to facilitate regulated substance environmental clearances. The completion date for this contract will be 42 months after authorization to proceed. The Phase I portion is expected to be completed in 24 months and the Phase II portion is expected to be completed in 18 months. A planned Supplement for Phase II will be done near the completion of Phase I. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 33 - RFQ - US 6 (E) Intersection With Il 47 in Morris, Just South of I80, Phase I/II Project, Grundy County, Region Two/District Three

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
118
Bidding Soon
1,815
All Active Projects
831
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2025

img_map_placeholder

US-6 & IL-47, Morris, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.