Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Morris, Illinois. Contact the soliciting agency for additional information.
This project requires 24% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 30, 2024, at 10:30 AM at the Region Two/District Three Office in Ottawa. Phase I/II engineering services are required to prepare a Project Report and Categorical Exclusion determination along with Plans, Specifications, and Estimates for reconstruction of the intersection of US 6 (E) with IL 47, just south of I-80 in Morris. The proposed work is anticipated to include reconstruction of the intersection along with geometric and safety improvements. Work may also include bicycle and pedestrian accommodations. Phase I work will include preparation of an Abbreviated Project Report, conducting route surveys, traffic studies, proposed design, crash analysis, along with review of maintenance of traffic, potential safety improvements, and bicycle and pedestrian accommodations. An intersection design study, utility coordination, preliminary cost estimates, preparing plan, profile and cross section sheets, a pavement design and life cycle cost analysis will be needed along with all other work necessary to complete the Phase I report. Phase II work will include preparation of Phase II final contract plans and special provisions. Work may include preparing roadway plans, identifying utility conflicts and relocations, preparing detailed staging and traffic control plans, participating in local agency coordination, providing quantities and detailed information to the district Estimator, and all other work necessary to complete the final contract Plans, Specifications, and Estimates. Locations, depths, and volumes of soil excavation shall be provided in the Districts format, to facilitate regulated substance environmental clearances. The completion date for this contract will be 42 months after authorization to proceed. The Phase I portion is expected to be completed in 24 months and the Phase II portion is expected to be completed in 18 months. A planned Supplement for Phase II will be done near the completion of Phase I. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 33 - RFQ - US 6 (E) Intersection With Il 47 in Morris, Just South of I80, Phase I/II Project, Grundy County, Region Two/District Three
Conceptual
Roads / Highways
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 21, 2025
US-6 & IL-47, Morris, IL
Related To This Project
Morris, IL
Bid Date: Sep 05 2024
Morris, IL
Bid Date: Sep 13 2024
Morris, IL
Bid Date: Sep 26 2024
Morris, IL
Bid Date: Oct 15 2024
Morris, IL
Bid Date: Oct 16 2024
Morris, IL
Bid Date: Nov 08 2024
Morris, IL
Bid Date: Dec 11 2024
Morris, IL
Bid Date: Aug 12 2024
Morris, IL
Bid Date: Jul 18 2024
Morris, IL
Bid Date: Nov 10 2020
Morris, IL
Bid Date: Jun 14 2024
Morris, IL
Bid Date: Jun 14 2024
Morris, IL
Bid Date: Apr 24 2024
Morris, IL
Bid Date: Sep 12 2019
Morris, IL
Bid Date: May 07 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.