Renovation of an educational facility in Palatine, Illinois. Completed plans call for the renovation of a educational facility.
B.Work includes (but is not limited to) the following temperature control and electrical work. 1. Temperature Control work includes: a.Replacement of terminal unit controllers in Buildings X,Y, Z. b.Installation of new network controllers. c.Installation of new field communication wiring linking the new controllers. d.Integration of the new terminal unit controllers into the Campus' Tridium supervisory platform 2. Electrical work includes: a.As required to support mechanical scope. E.Bid security in the form of bid bond in an amount equalto 10 percent (10%) of the aggregate of the Base Bidamount and all Alternate Bid amounts shall be submittedwith the bid. F.Performance, Labor and Material Payment Bonds, andCertificate of Insurance will be required from the successful bidder. G.Bids shall be submitted in an opaque sealed envelope addressed to: Harper College, Purchasing Department, located in A-Building, Room A-217, 1200 W. Algonquin Road;Palatine, Illinois 60067. H.No bid may be withdrawn for a period of ninety days after submission without the consent of the Board of Trustees. I. Any bid submitted unsealed, unsigned, fax transmission,e-mail, or received subsequent to the aforementioned dateand time, may be disqualified and returned to the bidder. J.Harper College reserves the right to reject any or all bidsor parts thereof, to waive any irregularities or informalities in bidding procedures, and to award the contract in amanner best serving the interest of the College. K.All bidders must comply with applicable Illinois Law requiring the payment of prevailing wages by all Contractorsworking on public works. Bidder must comply with the Illinois Statutory requirements regarding labor, includingEqual Employment Opportunity Laws. L.Contractors shall pay not less than the prevailing rates ofwages to all laborers, workmen, and mechanics performing work under this contract and shall comply with the requirements of the Illinois Wages of Employees on PublicWorks Act (820 ILCS 130/1-12). M.Bidders shall comply with Business Enterprise Program: Participation and Utilization Plan developed byHarper College. There is a 30 percent aspirational goal onthe contract. O.The successful bidder will enter into a Contract with theOwner in the form of an Agreement as provided in the Project Manual. P.Please submit any questions regarding the bidding documents by Tuesday, August 13, 2024, at 4:00 p.m. CentralTime. 1. Questions are to be directed via e-mail to: Stephen Zehr szehr@grummanbutkus.com 2. The Harper College Purchasing Manager is to be copied on all submitted questions: Jewell Jackson purchasing@harpercollege.edu Additional digital copies of the construction documents shall also be available on compact disk from the printer at no additional cost upon deposit and pickup of a hard copy set of the construction documents.B.Work includes (but is not limited to) the following temperature control and electrical work. 1. Temperature Control work includes: a.Replacement of terminal unit controllers in Buildings X,Y, Z. b.Installation of new network controllers. c.Installation of new field communication wiring linking the new controllers. d.Integration of the new terminal unit controllers into the Campus' Tridium supervisory platform 2. Electrical work includes: a.As required to support mechanical scope. E.Bid security in the form of bid bond in an amount equalto 10 percent (10%) of the aggregate of the Base Bidamount and all Alternate Bid amounts shall be submittedwith the bid. F.Performance, Labor and Material Payment Bonds, andCertificate of Insurance will be required from the successful bidder. G.Bids shall be submitted in an opaque sealed envelope addressed to: Harper College, Purchasing Department, located in A-Building, Room A-217, 1200 W. Algonquin Road;Palatine, Illinois 60067. H.No bid may be withdrawn for a period of ninety days after submission without the consent of the Board of Trustees. I. Any bid submitted unsealed, unsigned, fax transmission,e-mail, or received subsequent to the aforementioned dateand time, may be disqualified and returned to the bidder. J.Harper College reserves the right to reject any or all bidsor parts thereof, to waive any irregularities or informalities in bidding procedures, and to award the contract in amanner best serving the interest of the College. K.All bidders must comply with applicable Illinois Law requiring the payment of prevailing wages by all Contractorsworking on public works. Bidder must comply with the Illinois Statutory requirements regarding labor, includingEqual Employment Opportunity Laws. L.Contractors shall pay not less than the prevailing rates ofwages to all laborers, workmen, and mechanics performing work under this contract and shall comply with the requirements of the Illinois Wages of Employees on PublicWorks Act (820 ILCS 130/1-12). M.Bidders shall comply with Business Enterprise Program: Participation and Utilization Plan developed byHarper College. There is a 30 percent aspirational goal onthe contract. O.The successful bidder will enter into a Contract with theOwner in the form of an Agreement as provided in the Project Manual. P.Please submit any questions regarding the bidding documents by Tuesday, August 13, 2024, at 4:00 p.m. CentralTime. 1. Questions are to be directed via e-mail to: Stephen Zehr szehr@grummanbutkus.com 2. The Harper College Purchasing Manager is to be copied on all submitted questions: Jewell Jackson purchasing@harpercollege.edu Additional digital copies of the construction documents shall also be available on compact disk from the printer at no additional cost upon deposit and pickup of a hard copy set of the construction documents.
Post-Bid
Educational
$300,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 26, 2024
September 25, 2024
1200 W Algonquin Rd, Palatine, IL
Related To This Project
Palatine, IL
Bid Date: Sep 03 2024
Palatine, IL
Bid Date: Aug 29 2024
Palatine, IL
Bid Date: Sep 05 2024
Palatine, IL
Bid Date: Sep 16 2024
Palatine, IL
Bid Date: Sep 10 2024
Palatine, IL
Bid Date: Sep 17 2024
Palatine, IL
Bid Date: Sep 13 2024
Palatine, IL
--
Palatine, IL
Bid Date: Aug 20 2024
Palatine, IL
Bid Date: Oct 28 2021
Palatine, IL
Bid Date: Sep 29 2021
Palatine, IL
Bid Date: Sep 03 2020
Palatine, IL
Bid Date: Mar 11 2019
Palatine, IL
Bid Date: Aug 20 2024
Palatine, IL
Bid Date: Aug 09 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.