Demolition, site work and renovation of a civil project in Coeur D Alene, Idaho. Completed plans call for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Project includes the following Work: Replacement of approximately 8,300 LF of water lines. Construction of new water storage reservoir and site improvements, pressure reducing valve station, and water treatment plant improvements. Booster station improvements include demolition and replacement of mechanical piping, pumps, fittings, valves, appurtenances and upgrades to HVAC, and electrical systems including new standby generators. Project Elements - The major project elementsfor the construction project are listed below: 1. Distribution Improvements a. Installation of water pipe, including trenching, bedding, backfill, protection of existing utilities, surface repair and service connections. b. Inclusion of valves, fittings and connections as per PLANS. c. New air relief valve vault. d. Final grading and surface repair. e. Pressure reducing valve station in Vista Heights 2. Lake Intake Pump Station a. Selective demolition of existing mechanical piping, valves and appurtenances. b. Installation (and furnishing) of two new pumps. c. Mechanical piping, including valves, fittings, pipe spools, flow meter and pipe supports. d. HVAC and ventilation. e. Electrical and controls provisions. f. Civil site and building improvements including an exterior access hatch for the culvert, concrete slab repair, and new roof hatch. 3. Vista Booster Station a. Demolition of existing mechanical piping, valves, appurtenances, electrical and controls equipment. b. Installation (and furnishing) of four new booster pumps. c. Mechanical piping, including valves, fittings, pipe spools, flow meter and pipe supports. d. HVAC and ventilation. e. Electrical and controls provisions including new standby generator. f. Civil site and building improvements including a new door, surface restoration, chain link fencing, gate, generator pad, and french drain. 4. Buckboard Tank a. Earthwork excavation, backfill, and final grading. b. New partially buried concrete water storage tank. c. Yard piping, including fittings and valves. d. Removal of the existing metal tanks. e. Civil site improvements including surface restoration, chain link fencing, and gate. 5. Water Treatment Plant Improvements a. Demolition of existing concrete and mechanical valves and fittings per PLANS. b. Installation of FRP grating. Question Deadline 08/22/2024

Bid Results

Water / Sewer

$3,443,471.00

Public - County

Demolition, Renovation, Site Work

108

33

10

7

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
3
Bidding Soon
106
All Active Projects
34
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2024

November 4, 2024

img_map_placeholder

5866 E Sunnyside Rd, Coeur D Alene, ID

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.