EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 27, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a development in Coeur D Alene, Idaho. Completed plans call for site work for a development.

SCOPE OF CONTRACT This project consists of the decommissioning, removal, and replacement of a pit toilet at Lone Mountain Tree Improvement Area located on the Coeur d'Alene River Ranger District on the Idaho Panhandle National Forest. The objective of this contract is to improve health and safety standards and support increased employee activity at Lone Mountain TIA. The replacement of the existing pit toilet to a concrete vault toilet will also improve environmental safety by isolating human waste to a vault. Lone Mountain TIA contains four genetic test plantations, three blister rust resistant white pine seed orchards, and blister rust inoculation beds. These are all actively maintained for the Region 1 Genetic Resource Program and support regional reforestation efforts. PROJECT LOCATION This project is in the Idaho Panhandle NF, Coeur D Alene Nursery , NUR Lone Mountain (See Maps attachment for details. The service site is approximately 7 miles north of Rathdrum, Idaho on West Seasons Road off on State Highway 41. This administrative site is a part of the Idaho Panhandle National Forest. The site is fenced, and access is through a locked gate located immediately off the paved road. The terrain is flat with little to no elevation change. AGNITUDE OF CONSTRUCTION PROJECT In accordance with FAR Part 23.204 (a) Less than $25,000. SITE VISIT Per FAR Part 52.236-3 "Site Investigation and Conditions Affecting the Work", contractor is encouraged and expected to visit the site. No official Site Visit shall be performed. Contractors may to visit the site at their discretion. Ensure you are familiar with inclement weather as this may hinder access to certain roads. PERIOD OF PERFORMANCE Work on the site shall commence approximately October 15, 2024, and proceed in accordance with the contractor's approved work schedule, and run continuously till the end of the project no later than December 31, 2024. BONDING Bonding: In accordance with FAR Part 28.102-1, a Payment Bond or Irrevocable Letter of Credit (ILC) for 100% of the contract price are required for offers over $35,000 but not to exceed $150,000. Bonds shall be provided within 10 days of award.

Post-Bid

Conservation and Development

$25,000.00

Public - Federal

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, References, Definitions, Execution and Closeout Requirements, Execution
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 31 - Earthwork

Division 31 - Earthwork

Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
14
Bidding Soon
147
All Active Projects
91
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2024

October 15, 2024

img_map_placeholder

3600 Nursery Rd, Coeur D Alene, ID

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Idaho Panhandle Nur Lone Mountain Toilet Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.