Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Sherman, New York. Completed plans call for the renovation of a educational facility.
As of September 17, 2024, project was awarded to Allgaier Construction with bid amount of $54,000 & (Alternate #1 All work associated with renovations in room 302 Girls Room $43,000). Project Location: K-12 Building 127 Park Street Sherman, NY 14781 Concurrent Work: Owner will award a prime contract for the following construction operations at Project site. Those operations will be conducted simultaneously with work under this Contract. 1. General Trades ACCESS TO SITE A. General: Contractor shall have limited use of Project site for construction operations and as indicated by requirements of this Section. B. Use of Site: Limit use of Project site to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated. C. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations. The Design of This Project Conforms to All Applicable Provisions of the New York State Uniform Fire Prevention and Building Code, the New York State Energy Conservation Code, and the Building Standards of the New York State Education Department. No New Asbestos Containing Building Materials (Acbm) Shall Be Used in Construction The Work of Project is defined by the Contract Documents and consists of the following: 1. The work of this agreement shall include, but not limited to, all labor, materials, tools, equipment, plant, supplies, shop drawings, layout, transportation, supervision, contributions, insurance compliance with all agencies (Town, County, State and federal as may be required), and shall cover all other items necessary for the performance of the Awarded Contracts as shown detailed and/or implied by the following documents and as defined herein. This requisition is intended to supplement the Contract Specifications and drawings and must be used in coordination with these documents to fully understand the Scope of Work. Requirements given in one area thus are applicable to all. This requisition does not generally repeat scope requirements given in the Contract Documents, but clarifies and coordinates the work. 2. s and as defined herein. This requisition is intended to supplement the Contract Specifications and drawings and must be used in coordination with these documents to fully understand the Scope of Work. Requirements given in one area thus are applicable to all. This requisition does not generally repeat scope requirements given in the Contract Documents, but clarifies and coordinates the work. 3. ications and drawings and must be used in coordination with these documents to fully understand the Scope of Work. Requirements given in one area thus are applicable to all. This requisition does not generally repeat scope requirements given in the Contract Documents, but clarifies and coordinates the work. Bid bond payable to the owner shall be submitted with each bid in the amount of 5 percent of the bid amount. No bids may be withdrawn for a period of 60 days after opening of bids. Owner reserves the right to accept or reject any and all bids, to re-advertise for new bids and to waive informalities and irregularities in connection with any bid. There will be no pre-bid conference walk through. For inquiries, please contact Jared Oehlbeck, Buildings and Grounds, at 716-761-6121. Estimated range $70,000-$80,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SUMMARY A. Section Includes: 1. Work covered by Contract Documents. 2. Access to site. 3. Coordination with occupants. 4. Work restrictions. 5. Specification and drawing conventions. 1.2 WORK COVERED BY CONTRACT DOCUMENTS A. The Work of Project is defined by the Contract Documents and consists of the following: 1. The work of this agreement shall include, but not limited to, all labor, materials, tools, equipment, plant, supplies, shop drawings, layout, transportation, supervision, contributions, insurance compliance with all agencies (Town, County, State and federal as may be required), and shall cover all other items necessary for the performance of the Awarded Contracts as shown detailed and/or implied by the following documents and as defined herein. This requisition is intended to supplement the Contract Specifications and drawings and must be used in coordination with these documents to fully understand the Scope of Work. Requirements given in one area thus are applicable to all. This requisition does not generally repeat scope requirements given in the Contract Documents, but clarifies and coordinates the work. 2. s and as defined herein. This requisition is intended to supplement the Contract Specifications and drawings and must be used in coordination with these documents to fully understand the Scope of Work. Requirements given in one area thus are applicable to all. This requisition does not generally repeat scope requirements given in the Contract Documents, but clarifies and coordinates the work. 3. ications and drawings and must be used in coordination with these documents to fully understand the Scope of Work. Requirements given in one area thus are applicable to all. This requisition does not generally repeat scope requirements given in the Contract Documents, but clarifies and coordinates the work. Question Deadline Aug 16, 2024
Award
Educational
$54,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 27, 2024
November 1, 2024
127 Park St, Sherman, NY
Related To This Project
Sherman, NY
Bid Date: Mar 20 2024
Sherman, NY
Bid Date: Mar 29 2024
Sherman, NY
Bid Date: Apr 22 2020
Sherman, NY
Bid Date: Jan 23 2024
Sherman, NY
Bid Date: Oct 07 2019
Sherman, NY
Bid Date: Oct 07 2019
Sherman, NY
Bid Date: Nov 09 2021
Sherman, NY
Bid Date: Nov 18 2021
Sherman, NY
Bid Date: Mar 10 2023
Sherman, NY
Bid Date: Jul 13 2022
Sherman, NY
Bid Date: Nov 04 2021
Sherman, NY
Bid Date: Nov 15 2022
Glens Falls, NY
Bid Date: Sep 12 2024
Groveland, NY
Bid Date: Aug 21 2024
Cortlandt Manor, NY
Bid Date: Sep 03 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.