Renovation of an educational facility in Sherman, New York. Completed plans call for the renovation of a educational facility.

As of September 17, 2024, project was awarded to Allgaier Construction with bid amount of $54,000 & (Alternate #1 All work associated with renovations in room 302 Girls Room $43,000). Project Location: K-12 Building 127 Park Street Sherman, NY 14781 Concurrent Work: Owner will award a prime contract for the following construction operations at Project site. Those operations will be conducted simultaneously with work under this Contract. 1. General Trades ACCESS TO SITE A. General: Contractor shall have limited use of Project site for construction operations and as indicated by requirements of this Section. B. Use of Site: Limit use of Project site to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated. C. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations. The Design of This Project Conforms to All Applicable Provisions of the New York State Uniform Fire Prevention and Building Code, the New York State Energy Conservation Code, and the Building Standards of the New York State Education Department. No New Asbestos Containing Building Materials (Acbm) Shall Be Used in Construction The Work of Project is defined by the Contract Documents and consists of the following: 1. The work of this agreement shall include, but not limited to, all labor, materials, tools, equipment, plant, supplies, shop drawings, layout, transportation, supervision, contributions, insurance compliance with all agencies (Town, County, State and federal as may be required), and shall cover all other items necessary for the performance of the Awarded Contracts as shown detailed and/or implied by the following documents and as defined herein. This requisition is intended to supplement the Contract Specifications and drawings and must be used in coordination with these documents to fully understand the Scope of Work. Requirements given in one area thus are applicable to all. This requisition does not generally repeat scope requirements given in the Contract Documents, but clarifies and coordinates the work. 2. s and as defined herein. This requisition is intended to supplement the Contract Specifications and drawings and must be used in coordination with these documents to fully understand the Scope of Work. Requirements given in one area thus are applicable to all. This requisition does not generally repeat scope requirements given in the Contract Documents, but clarifies and coordinates the work. 3. ications and drawings and must be used in coordination with these documents to fully understand the Scope of Work. Requirements given in one area thus are applicable to all. This requisition does not generally repeat scope requirements given in the Contract Documents, but clarifies and coordinates the work. Bid bond payable to the owner shall be submitted with each bid in the amount of 5 percent of the bid amount. No bids may be withdrawn for a period of 60 days after opening of bids. Owner reserves the right to accept or reject any and all bids, to re-advertise for new bids and to waive informalities and irregularities in connection with any bid. There will be no pre-bid conference walk through. For inquiries, please contact Jared Oehlbeck, Buildings and Grounds, at 716-761-6121. Estimated range $70,000-$80,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SUMMARY A. Section Includes: 1. Work covered by Contract Documents. 2. Access to site. 3. Coordination with occupants. 4. Work restrictions. 5. Specification and drawing conventions. 1.2 WORK COVERED BY CONTRACT DOCUMENTS A. The Work of Project is defined by the Contract Documents and consists of the following: 1. The work of this agreement shall include, but not limited to, all labor, materials, tools, equipment, plant, supplies, shop drawings, layout, transportation, supervision, contributions, insurance compliance with all agencies (Town, County, State and federal as may be required), and shall cover all other items necessary for the performance of the Awarded Contracts as shown detailed and/or implied by the following documents and as defined herein. This requisition is intended to supplement the Contract Specifications and drawings and must be used in coordination with these documents to fully understand the Scope of Work. Requirements given in one area thus are applicable to all. This requisition does not generally repeat scope requirements given in the Contract Documents, but clarifies and coordinates the work. 2. s and as defined herein. This requisition is intended to supplement the Contract Specifications and drawings and must be used in coordination with these documents to fully understand the Scope of Work. Requirements given in one area thus are applicable to all. This requisition does not generally repeat scope requirements given in the Contract Documents, but clarifies and coordinates the work. 3. ications and drawings and must be used in coordination with these documents to fully understand the Scope of Work. Requirements given in one area thus are applicable to all. This requisition does not generally repeat scope requirements given in the Contract Documents, but clarifies and coordinates the work. Question Deadline Aug 16, 2024

Award

Educational

$54,000.00

Public - City

Renovation

8

10

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
43
Bidding Soon
845
All Active Projects
371
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2024

November 1, 2024

img_map_placeholder

127 Park St, Sherman, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.