Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 22, 2025 at 7:00 PM
Updated November 23, 2025
Site work and paving for a bridge / tunnel in Plato, Minnesota. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
UPDATE : https://www.dot.state.mn.us/d8/projects/hwy212plato/index.html Replace bridge decks Replace approach panels Replace guardrails Traffic impacts Our goal is to minimize disruption to traffic and prevent construction delays during the project. To achieve this, preparatory work will begin in late 2025. This includes constructing traffic crossovers ahead of time, eliminating the need for a detour during the bridge construction in 2026. Constructing lane crossovers includes setting up temporary lanes alongside the existing lanes to allow traffic to flow smoothly and safely during the bridge work. It will take approximately 6 weeks to complete the lane crossovers in 2025. Once work begins in 2026 to replace the bridges, the lane crossovers will remain in place throughout the duration of the project. Construction is expected to last the entire summer. Below are maps showing the crossover locations for both westbound and eastbound traffic: Project is in Minnesota Department of Transportation - District 8 capital budget fy 2025 -2029 CIP ________________________________________________________________________________________________ **bfp**: us 212, 1 mile w. Of cr 9 (plato), replace span on bridges 43005 & 43008 Miles : 0.6 Work type : Bridge Deck Replacement As of November 22 , 2025, the project is in Conceptual status. Anticipated letting Year is 2026. MNDOT - Bridge Deck Replacement - US 212 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$7,700,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2026
US-212, Plato, MN
Related To This Project
Storden, MN
--
Grading Bituminous Milling and Surfacing Ultrathin Bonded Wearing Course Concrete Pavement - 5966993
Ramsey, MN
Bid Date: Dec 03 2025
Longville, MN
--
Schroeder, MN
--
Cloquet, MN
--
Waseca, MN
Bid Date: Dec 18 2025
Pillager, MN
--
Oshawa, MN
--
Proctor, MN
--
Cambridge, MN
--
Princeton, MN
--
Virginia, MN
--
McGregor, MN
--
Minneapolis, MN
Bid Date: Jan 07 2026
Virginia, MN
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
