BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 22, 2025 at 7:00 PM

Updated November 23, 2025

Site work and paving for a bridge / tunnel in Plato, Minnesota. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

UPDATE : https://www.dot.state.mn.us/d8/projects/hwy212plato/index.html Replace bridge decks Replace approach panels Replace guardrails Traffic impacts Our goal is to minimize disruption to traffic and prevent construction delays during the project. To achieve this, preparatory work will begin in late 2025. This includes constructing traffic crossovers ahead of time, eliminating the need for a detour during the bridge construction in 2026. Constructing lane crossovers includes setting up temporary lanes alongside the existing lanes to allow traffic to flow smoothly and safely during the bridge work. It will take approximately 6 weeks to complete the lane crossovers in 2025. Once work begins in 2026 to replace the bridges, the lane crossovers will remain in place throughout the duration of the project. Construction is expected to last the entire summer. Below are maps showing the crossover locations for both westbound and eastbound traffic: Project is in Minnesota Department of Transportation - District 8 capital budget fy 2025 -2029 CIP ________________________________________________________________________________________________ **bfp**: us 212, 1 mile w. Of cr 9 (plato), replace span on bridges 43005 & 43008 Miles : 0.6 Work type : Bridge Deck Replacement As of November 22 , 2025, the project is in Conceptual status. Anticipated letting Year is 2026. MNDOT - Bridge Deck Replacement - US 212 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$7,700,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
242
Active Projects
118
Bidding Soon
1,457
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.