BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in Sacramento, California. Conceptual plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.

Update:https://bdm.saccounty.gov/FY2024-25BudgetInformation/Documents/Recomm.Budget/CapitalImprovementPlan.pdf The Arden Park Vista service area was constructed beginning in the post WWII 1940's. The northeastern tip of the service area, located east of Eastern Boulevard and south of Arden Way, is served primarily by the Stewart Well, which is located on Stewart Road. In the spring of 2011, the Stewart Well failed requiring major rehabilitation. During the assessment of the well, SCWA found that the geology had changed and the well can only safely produce about 1/3 the original capacity. The Arden Way Well will bridge the production gap between the previous and current capacity of the Stewart Well. The Arden Way Well project will include the construction of a domestic potable water well, chemical feed system, electrical panels, SCADA system, and distribution main pipe connecting the well to the existing distribution system. Project is included Sacramento County Fiscal Year 2025-2029 Page no 976 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The Arden Park Vista service area was constructed beginning in the post WWII 1940's. The northeastern tip of the service area, located east of Eastern Boulevard and south of Arden Way, is served primarily by the Stewart Well, which is located on Stewart Road. In the spring of 2011, the Stewart Well failed requiring major rehabilitation. During the assessment of the well, SCWA found that the geology had changed and the well can only safely produce about 1/3 the original capacity. The Arden Way Well will bridge the production gap between the previous and current capacity of the Stewart Well. The Arden Way Well project will include the construction of a domestic potable water well, chemical feed system, electrical panels, SCADA system, and distribution main pipe connecting the well to the existing distribution system. The project is include in the county's 2023-2028 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$3,532,129.00

Public - County

Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
330
Active Projects
161
Bidding Soon
2,980
All Active Projects
1,224
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 1, 2028

img_map_placeholder

To Be Determined, Sacramento, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.