Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 5, 2024 at 8:00 PM
Updated October 1, 2024
Demolition, site work, paving and new construction of a bridge / tunnel in Oak Park, Minnesota. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Maywood TWP Bridge Replacement. Site Address: 105th St NE, Between CR 67 & CSAH 7. Description: Bridge Replacement, Approach Grading & Aggregate Surfacing. This Work consists of providing additional traffic control devices in accordance with S-36 (2563) TRAFFIC CONTROL and as authorized by the Engineer. The Engineer is authorized to: (1) Require extra traffic control devices in addition to the traffic control devices shown in the Traffic Control Plan or in the Field Manual. (2) Require additional traffic control devices for EXTRA WORK. (3) Require extended use for all traffic control devices which are impacted by excusable and compensable delays, as defined in MnDOT 1806.2B. (4) Negotiate compensation for a Lump Sum Payment.
Award
Bridges / Tunnels
$368,862.00
Public - County
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 30, 2024
September 30, 2024
105th St NE, Oak Park, MN
Related To This Project
Oak Park, MN
Bid Date: Aug 30 2024
Oak Park, MN
Bid Date: Sep 13 2024
Oak Park, MN
Bid Date: Oct 06 2023
Aurora, MN
Bid Date: Aug 28 2024
Gaylord, MN
--
Gaylord, MN
--
North Mankato, MN
--
Moorhead, MN
--
Gaylord, MN
--
North Mankato, MN
--
North Mankato, MN
--
Gaylord, MN
--
Gaylord, MN
--
Eagle Lake, MN
--
Fairfax, MN
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.