Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 7, 2025 at 8:00 PM
Updated August 8, 2025
Site work and new construction of an office development in District 23, Ballenger, Maryland. Conceptual plans call for the construction of a office development; and for site work for a office development.
Update: This project will consist of converting an existing open courtyard inside the secure perimeter of the facility, enclosing this courtyard, and making office space for mental health counselors. The proposed layout will include three to four offices, interview rooms, and a staging room. Currently the facility is overcrowded with regards to office space. The current mental health staff (3 contract staff and 1 from the Health Department) share one office. There is currently only one designated space to conduct mental health interviews/exams, and this space is also utilized for inmate disciplinary hearings, inmate orientations and other various activities. In this same area of the facility, there are classification specialists and other support staff also sharing office space (3 staff together in one office and 4 staff in the other office). The additional office space would also open up the current office space for the Inmate Services Classification Specialists to utilize. Project is included Frederick County Fiscal Year 2026-2031 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- This project will consist of converting an existing open courtyard inside the secure perimeter of the facility, enclosing this courtyard, and making office space for mental health counselors. The proposed layout will include three to four offices, interview rooms, and a staging room. Currently the facility is overcrowded with regards to office space. The current mental health staff (3 contract staff and 1 from the Health Department) share one office. There is currently only one designated space to conduct mental health interviews/exams, and this space is also utilized for inmate disciplinary hearings, inmate orientations and other various activities. In this same area of the facility, there are classification specialists and other support staff also sharing office space (3 staff together in one office and 4 staff in the other office). The additional office space would also open up the current office space for the Inmate Services Classification Specialists to utilize. As of August 7, 2024, this project is included in the county's 2025-2030 Capital Improvement *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Office
$1,400,000.00
Public - County
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
To Be Determined, District 23, Ballenger, MD
Related To This Project
District 23, Ballenger, MD
--
District 23, Ballenger, MD
Bid Date: Mar 20 2025
District 23, Ballenger, MD
Bid Date: Jan 16 2025
District 23, Ballenger, MD
Bid Date: Feb 06 2025
District 23, Ballenger, MD
--
District 23, Ballenger, MD
Bid Date: Mar 20 2025
District 23, Ballenger, MD
--
District 23, Ballenger, MD
Bid Date: Jul 10 2025
District 23, Ballenger, MD
--
District 23, Ballenger, MD
--
District 23, Ballenger, MD
--
District 23, Ballenger, MD
--
District 23, Ballenger, MD
Bid Date: Jun 20 2024
District 23, Ballenger, MD
Bid Date: Jun 13 2024
District 23, Ballenger, MD
Bid Date: Jun 13 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
