Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 1, 2025 at 8:00 PM
Updated May 2, 2025
Site work and paving for a mixed-use development in Bothell, Washington. Conceptual plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
Update:This project will repair the stream bank where storm flooding caused damage to the stream bank, undermining the trail. Project is included in City of Bothell Fiscal Year 2025-2031 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- T97 - North Creek FEMA Repairs DESCRIPTION: This project will repair the stream bank where storm flooding caused damage to the stream bank, undermining the trail. JUSTIFICATION: North Creek Trail is a seven-mile regional, multi-use trail connecting the Burke-Gilman/Sammamish River Trail in King County and the Interurban Trail at McCollum Park in Snohomish County. Repair of the stream bank will protect against future flooding damage. FUTURE MAINTENANCE AND OPERATING (M & O) COSTS: Plant establishment M & O costs will occur for five years beginning at construction completion. TIMING PRIORITY CONSIDERATIONS: This is a high-priority repair project. Phases 1 & 2 are already complete. This project will construct Phase 3. A Federal Emergency Management Act (FEMA) grant was awarded for construction of Phases 1 & 2 which involved trail stabilization measures and woody debris relocation. Phase 3 construction will occur in Summer 2025 or 2026. FEMA and State grants are expected to be awarded for 87.5% of the design and construction costs of Phase 3. The City is in the middle of the Public Assistance (PA) grant process with FEMA. The deadline for construction completion is five years from the disaster event in 2021. As long as progress towards mitigation repairs is on-going, the five years can be extended by request. PROJECT COMMENCEMENT REQUIREMENTS: Project has secured funding and has begun. PROJECT STOPPING POINT(S); Project spending is not authorized in excess of adopted funding resources. STATUS: Project is under design.
Conceptual
Water / Sewer
$925,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2025
North Creek Trail, Bothell, WA
Related To This Project
Bothell, WA
--
Bothell, WA
Bid Date: May 22 2025
Bothell, WA
Bid Date: May 16 2025
Bothell, WA
Bid Date: Jun 05 2025
Bothell, WA
Bid Date: Apr 29 2025
Bothell, WA
Bid Date: Apr 16 2025
Bothell, WA
Bid Date: Apr 28 2025
Bothell, WA
Bid Date: May 01 2025
Bothell, WA
Bid Date: Apr 22 2025
Bothell, WA
Bid Date: Apr 16 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
