BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 1, 2025 at 8:00 PM

Updated May 2, 2025

Site work and paving for a mixed-use development in Bothell, Washington. Conceptual plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Update:This project will repair the stream bank where storm flooding caused damage to the stream bank, undermining the trail. Project is included in City of Bothell Fiscal Year 2025-2031 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- T97 - North Creek FEMA Repairs DESCRIPTION: This project will repair the stream bank where storm flooding caused damage to the stream bank, undermining the trail. JUSTIFICATION: North Creek Trail is a seven-mile regional, multi-use trail connecting the Burke-Gilman/Sammamish River Trail in King County and the Interurban Trail at McCollum Park in Snohomish County. Repair of the stream bank will protect against future flooding damage. FUTURE MAINTENANCE AND OPERATING (M & O) COSTS: Plant establishment M & O costs will occur for five years beginning at construction completion. TIMING PRIORITY CONSIDERATIONS: This is a high-priority repair project. Phases 1 & 2 are already complete. This project will construct Phase 3. A Federal Emergency Management Act (FEMA) grant was awarded for construction of Phases 1 & 2 which involved trail stabilization measures and woody debris relocation. Phase 3 construction will occur in Summer 2025 or 2026. FEMA and State grants are expected to be awarded for 87.5% of the design and construction costs of Phase 3. The City is in the middle of the Public Assistance (PA) grant process with FEMA. The deadline for construction completion is five years from the disaster event in 2021. As long as progress towards mitigation repairs is on-going, the five years can be extended by request. PROJECT COMMENCEMENT REQUIREMENTS: Project has secured funding and has begun. PROJECT STOPPING POINT(S); Project spending is not authorized in excess of adopted funding resources. STATUS: Project is under design.

Conceptual

Water / Sewer

$925,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
97
Bidding Soon
1,774
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2025

Project location map

North Creek Trail, Bothell, WA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.