BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 1, 2025 at 8:00 PM

Updated May 2, 2025

Site work and paving for a mixed-use development in Bothell, Washington. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Update:Replace driveways and 8 ramps along the west side of 104th Ave NE and Kaysner Way from NE 185th St to SR 522. This will improve pedestrian access to the Sound Transit bus rapid transit (BRT) station that will be located at the NE 185th St / 104th Ave NE intersection. Project is included in City of Bothell Fiscal Year 2025-2031 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- T107 - Downtown Sound Transit Access - 104th Ave NE DESCRIPTION: Replace driveways and 8 ramps along the west side of 104th Ave NE and Kaysner Way from NE 185th St to SR 522. This will improve pedestrian access to the Sound Transit bus rapid transit (BRT) station that will be located at the NE 185th St / 104th Ave NE intersection. JUSTIFICATION: The existing sidewalks in the downtown area were constructed in excess of 20 years ago. As most of the downtown area is redeveloped, pedestrian facilities are being brought to current standards; however, redevelopment will not happen on all downtown streets thus leaving areas of sidewalks in very poor condition. The streets most affected by lack of redevelopment are the north-south streets between the main transit corridor, NE 185th St., and the downtown businesses on Main Street, one of which is 104th Ave NE. FUTURE MAINTENANCE AND OPERATING (M & O) COSTS: This project replaces existing driveways and ramps that are non-compliant. There will be no increase in maintenance costs. TIMING PRIORITY CONSIDERATIONS: This project will be funded by a potential Sound Transit 3 (ST3) access grant. Work would begin on this project if the grant is awarded and would be worked on so as to ensure completion by the time the SR 522 - NE 145th St / SR 522 Bus Rapid Transit Stride line begins service. PROJECT COMMENCEMENT REQUIREMENTS: Work will not begin unless the ST3 grant is awarded. PROJECT STOPPING POINT(S): Work will not begin unless the ST3 grant is awarded. STATUS: Working with Sound Transit to agree on estimated cost of the project relative to the scope of work prior to entering into an agreement for project completion.

Conceptual

Roads / Highways

$856,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
103
Bidding Soon
1,803
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2027

Project location map

104th Ave NE, Bothell, WA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.