BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 6, 2025 at 8:00 PM

Updated May 7, 2025

Site work for a playground / park / athletic field in Bothell, Washington. Completed plans call for site work for a playground / park / athletic field.

Field Turf Replacement, Tambark Creek Park Engineers Estimate (before tax): Base Bid: $917,673.75 Additive 1: $43,487.50 Additive 2: $8,575.00 Snohomish County in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252,42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. No oral interpretations of the Bid will be made to any Bidder. All questions must be submitted in writing by Email to purchasinq@snoco.org. Question Deadline 04/10/2025 A formal pre-bid site inspection will not be held. The park is open for visitors sunrise to sunset. Visit at your own convenience (17217 35th Ave SE, Bothell, WA 98012) and send all questions per requirements in this ITB. All bidders are urged to visit the site and submit questions. Scope of work to include all labor, material, equipment, transportation and services to install complete new vertical draining in-filled synthetic turf surfacing system for the soccer field area. System to be as herein specified including, but not specifically limited to the following: 1. Independent testing of synthetic turf materials prior to shipment to project site. 2. Review and acceptance or certification of field base (supplemental pad) as it applies to installation of turf system, permeability and warranty implementation. 3. Installation of complete vertical draining synthetic turf surfacing system. 4. Installation of all inlaid or tufted (as applicable) field lines and markings as indicated on the drawings. 5. Provide extra turf materials to the Owner for future repair and protective purposes. 6. Provide all appropriate maintenance and repair manuals and warranty package to Owner. Warranty shall include a pre-paid insurance policy in support of the warranty required for the field, for the entire warranty period from an A-rated domestic insurance carrier. 7. Complete specific maintenance activities at 6 months and 1 year after the date of acceptance

Post-Bid

Playgrounds / Parks / Athletic Fields

$917,673.00

Public - County

Site Work

24

4

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
104
Bidding Soon
1,805
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2025

May 22, 2025

Project location map

17217 35th Ave SE, Bothell, WA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.