Published May 1, 2025 at 8:00 PM

Updated May 2, 2025

Site work for a water / sewer project in Bothell, Washington. Completed plans call for site work for a water / sewer project.

Cost Estimate: $4,500,000 to $5,000,000. Bidders accept all risks of late delivery, regardless of fault. Bids properly received will be publicly opened and read at the Districts Administration Building. The District is not responsible for any costs incurred in response to this Invitation to Bid. The work under this Contract generally includes full containment, environmental controls, surface preparation and recoating of the interior and exterior of Nike Reservoir 1 and the interior of Nike Reservoir 2 both steel potable water reservoirs. The dimensions of Nike Reservoir 1 are 114-feet in diameter and 32-feet in height, with an approximate storage volume of 2.44 million gallons. The dimensions of Nike Reservoir 2 are 150-feet in diameter and 30-feet in height, with an approximate storage volume of 3.5 million gallons. The location of the work is 22608 4th Ave W, which is at the northwest quadrant of the intersection of 228th St SW and 4th Ave W. Bids shall be submitted in accordance with the Contract Documents. Bids shall constitute offers to the District, which shall be binding for 90 days from the date of bid opening. The District reserves the right to reject any bid, any portion of any bid and/or to reject all bids. The District further reserves the right, but without obligation, to waive informalities and irregularities. No bid will be considered unless accompanied by a bid guaranty (certified or cashier's check, surety bond, or postal money order) payable to Alderwood Water & Wastewater District in an amount not less than five percent (5%) of the Total Bid Price. It is recommended that Bidders Register in order to receive automatic e-mail notification of future addendums and to place themselves on the Self-Registered Bidders List". Bidders that do not register will not be automatically notified of addendums and will need to periodically check the online plan room for addendums issued on this project at(425)258-1303should you require assistance with access or registration. Plans, specifications, addendums, and bid results will be available for download at the District website . It is the responsibility of the bidder using the downloaded files to obtain and acknowledge addendums as identified in the Contract Documents. The District will not have bid documents available for purchase. Planholder registration information will be developed and maintained . Addendums will be issued and distributed to currently registered planholders. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$3,882,800.00

Public - City

Site Work

18

16

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
104
Bidding Soon
1,827
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

June 2, 2025

Project location map

22608 4th Ave W, Bothell, WA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.