BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 18, 2025 at 7:00 PM

Updated January 8, 2026

Demolition, site work, new construction, renovation and addition to a transportation facility in San Francisco, California. Completed plans call for the addition of a 631,022-square-foot transportation facility; for the demolition of a transportation facility; for the construction of a transportation facility; for the renovation of a 516,644-square-foot transportation facility; and for site work for a transportation facility.

Phased construction is underway. The estimate = total project construction cost. Original solicitation for historical purposes: The goal of this project is to expand Terminal 3 by approximately 631,022 gross square feet and to renovate approximately 516,644 gross square feet of the existing facility. The terminal will remain in operation throughout the project and will require extensive phasing. This will include upgrading building systems, seismic retrofit, improving passenger flow, enhancing the passenger experience, and new gates to maximize flexibility. Trade Package Scope Description: Turner is seeking prequalification submissions for the SFO Terminal 3 West Modernization Project BG 15 TP 201 Construction Hoist. The scope of work is to provide dual personnel and material hoist to support the SFO T3W West Addition project. Base scope includes west addition only, alternate to be provided for east addition. Turner is seeking RFQs for the following trade packages: Trade Package # Trade Package Name Estimate CM'D LBE Participation Requirement 201 Construction Hoist $2,500,000 0% Only vendors who successfully meet the prequalification criteria and are deemed qualified to execute work in their respective scope will be invited to submit a proposal. Vendors who fail to submit the necessary prequalification information will not be considered prequalified and, consequently, will not be permitted to participate in the project. Please contact Patty Heredia, pheredia@tcco.com on how to get prequalified with Turner Construction.

Under Construction

Transportation Terminals

$2,600,000,000.00

Public - City

Addition, Demolition, New Construction, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
13
Bidding Soon
1,938
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 21, 2024

June 2, 2025

Project location map

780 S Airport Blvd, San Francisco, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.