BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Remodeling and renovation of a military facility in Eglin, Florida. Completed plans call for the remodel of a military facility.

The objective of this project is for the Contractor to provide all labor, materials, and equipment necessary to remove and replace the existing damaged roofing system, metal flashings and roof metal at perimeter terminations at Satellite Pharmacy Building 17581 as describe in the attached documents at Eglin Air Force Base, Eglin AFB, FL 32542 in accordance with all Federal, State, and Installation codes and laws, to include preparation of a design as discussed below. The Contractor shall provide all labor, materials, and equipment necessary to safely remove and dispose of the current roof covering system, and to install a fully adhered 80 mil nominal minimal thickness Fleece Backed Polyvinylchloride (PVC) Roofing System (approximately 2400 sq. ft. of covered area). This roofing system shall have a finish matching existing with new rigid polyisocyanurate insulation, new cover board, new moisture barrier, new underlayment, and new sheet metal and membrane flashings. The work is intended to improve the environment of care, provide compliance with regulations/standards, and meet the safety requirements of current health standards. To facilitate this renovation, the Contractor shall: conduct a Site Investigation and Site Investigation Report, conduct a Hazardous Material Survey and Report for Asbestos Containing Materials [ACM]), produce a Work Plan for the renewal area, and provide MRR Action. This Task Order shall be completed in a minimum of four (5) phases. ? Phase I – Site Survey and Survey Report ? Phase II – 65% Design submittal ? Phase III – 95% Design submittal ? Phase IV – 100% Design submittal ? Phase V – Demolition, Replacement, Construction and Closeout Activities Period of performance is not stated at this time. Contract range is $250K to $500K. Proposals good for 120 calendar days. RFIs are due August 9, 2024. Wage Scale is FL20240217 Jan 5, 2024

Post-Bid

Military

$500,000.00

Public - Federal

Remodeling, Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
24
Bidding Soon
413
All Active Projects
174
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.