BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 5, 2024 at 8:00 PM

Updated September 6, 2024

Renovation of an educational facility in Minneapolis, Minnesota. Completed plans call for the renovation of a educational facility.

Construction Services for chiller replacement in Thompson Center, located on the east bank of the Twin Cities campus. Refer to the Request for Proposal documents (found in the Attachments tab) for full project details/requirements. The total construction budget for this Project is $290,000 (current dollars, no escalation). Deadline for RFP Questions August 20, 2024 at Noon Anticipated Authorization to Proceed September 13, 2024 Project scope Removal of one of two existing Disconnect hydronic piping Disconnect electrical - power supply, controls wiring, etc Remove chiller from roof Contractor furnished like-for-like replacement or University approved equivalent air cooled chiller with glycol as the working fluid Install new chiller on existing chiller supports Reconnect piping to existing (from chiller to headers) Reconnect electrical or controls cabling/wiring

Post-Bid

Educational

$290,000.00

Public - State/Provincial

Renovation

8

10

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
246
Active Projects
136
Bidding Soon
1,583
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2024

September 13, 2024

Project location map

501 23rd Ave SE, Minneapolis, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.