BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Beatty, Nevada. Conceptual plans call for site work for a 4,565-square-foot playground / park / athletic field.

As of October 8, 2024, bids received were rejected. Project is no longer needed. Unless otherwise specified elsewhere in this Response document, the Contractor shall meet all applicable specifications, as outlined in Washoe County Standard Specifications for Public Works Construction 2016, and any amendments to date. Cottonwood Park Playground Project, located in Beatty, Nye County, Nevada. The project consists of: Surfacing and Playstructure must fit within 4,565 sq. ft. Playstructure designed for ages 5-12y. Playstructure must have shade structures incorporated into design. Installation of Playstructure onto Corkeen surfacing. Contractor is responsible for site prep, excavation, temp fencing - spoils to remain on site. Contractor is responsible to remove and dispose of existing play equipment, concrete footers, and surfacing. Contractor is responsible to install approximately 422 linear feet of 6' orange temporary fencing. All posts to be pounded. Fencing to be removed after completion of project. Contractor is responsible to install approx. 140-250 of 6"x6" concrete curbing around play pit for containment of surfacing. Contractor is responsible to provide minimum of compacted AB subbase and level finish grade at depth required for Corkeen surfacing based on fall height of Playstructure. Contractor is responsible to install Corkeen surfacing; minimum requirement based on fall height of Playstructure. NOTICE OF REQUEST FOR BID NO. BGID-2024-01/ PWP-NY-2024-392 COTTONWOOD PARK PLAYGROUND PROJECT NOTICE IS HEREBY GIVEN that the Beatty General Improvement District, (herein called the "BGID") invites RESPONSES for the Cottonwood Park Playground Project. "Nye County is an Equal Opportunity Employer and Provider" Pre-bid Meeting: June 24, 2024 @ 10:00 am Contact Person: Beatty General Improvement District Autumn Arroyo 775-553-9393 bgid@sbcglobal.net Business Hours: 8am - 5pm Fax Number: 775-277-1875

Project Abandoned

Playgrounds / Parks / Athletic Fields

$250,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
2
Bidding Soon
13
All Active Projects
6
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2024

October 10, 2024

img_map_placeholder

To Be Determined, Beatty, NV

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.