BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a museum in Triangle, Virginia. Completed plans call for the renovation of a 7,700-square-foot museum.

Please see the attached Request for Quotations (RFQ) number M00264-24-Q-0182 and its associated attachments. Scope The NMMC Legacy Walk gallery flooring is becoming unsightly as, over 17 years, small areas of carpet have been replaced when damaged. This patchwork of repairs is beginning to degrade the overall look of the flooring and NMMC requires a total carpet replacement. In addition, NMMC requires two (2) interactive information kiosks to be built to match the one existing. This will allow NMMC the ability to have media-based directory signage in the gallery. VENDOR QUESTIONS: Any questions about this RFQ must be submitted via email to Molly Henderson at molly.henderson@usmc.mil no later than Friday, August 30, 2024, at 11:00 a.m. Eastern Time. No further questions will be accepted after this deadline. Any resultant amendment from Q&A will be posted with Q&A. SUBMISSION OF QUOTES: Quotes shall be submitted no later than the time and date specified on Block 8 of page 1 of the SF1449 solicitation. Quotes shall be submitted electronically via email to Molly Henderson at molly.henderson@usmc.mil. Vendors are responsible for ensuring their quotes have been received by the date and time specified in Block 8 on Page 1 of this solicitation. Delivery delays that cause a quote to be late are not the responsibility of the Government agency. PERIOD OF PERFORMANCE: Performance must be complete no later than 120 calendar days after date of contract award (ADC). Performance Requirements 3.1. Task: Carpet replacement. The Contractor shall: 3.1.1. Walk job site with Government Technical Point of Contact (TPOC) prior to starting work to better understand requirements and identify any issues that could interfere with the work. 3.1.2. Remove all existing freestanding benches and kiosks in the gallery. NMMC will provide onsite storage for these elements. The Contractor shall reinstall all removed elements after new carpet is installed. 3.1.3. Remove all existing carpet squares and vinyl flooring in the area of work (see Attachment 1). Contractor shall be responsible for disposal of flooring from NMMC property. 3.1.4. Clean and prepare concrete slab for new adhesive and carpet per manufacturer recommendations. The Contractor shall provide all materials needed to include adhesive and carpet. 3.1.5. Install new carpet squares in the area of work shown in Attachment 1. Carpet and flooring adhesive to be installed per manufacturer recommendations. 3.1.6. Replace, as needed, any vinyl baseboard that is damaged or unusable as a result of flooring removal. 3.2. Task: Interactive kiosks. The Contractor shall: 3.2.1. Create and submit fabrication drawings for two (2) interactive kiosks. These are to match the design and functionality of the existing kiosk (see Attachment 2). NMMC will review the submitted drawings and make corrections as needed. The Contractor will revise the drawings per this guidance and resubmit to NMMC for final approval. Drawing(s) shall be C size and created in AutoCAD software. 3.2.2. Contractor shall fabricate the kiosks per the approved drawings. The Contractor is not responsible for providing any audio/video equipment. 3.2.3. Contractor shall deliver the completed kiosks to the NMMC. The Contractor will not be responsible for installation of the kiosks in

Award

Museum

$129,459.00

Public - Federal

Renovation

6

5

2

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
75
Bidding Soon
1,999
All Active Projects
833
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2024

October 10, 2024

img_map_placeholder

1775 Semper Fidelis Wy, Triangle, VA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.