BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2024 at 8:00 PM

Updated August 13, 2024

Site work and paving for a sidewalk / parking lot in Greenville, South Carolina. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The City of Greenville is seeking proposals for design services for the Swamp Rabbit Trail Green Line between Hudson Street and River Street (between Unity Park and Downtown Greenville). The project consists of designing, cost estimating, and bid development, as well as value engineering and obtaining any necessary permits for construction. The Swamp Rabbit Trail has seen over a decade of use and is in need of repairs, rehabilitation, and upgrades. Questions regarding the bid may be sent to rgray@greenvillesc.gov. The method of Contractor Selection has not been Determined at this time.

Conceptual

Sidewalks / Parking Lot

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
67
Bidding Soon
1,088
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2025

Project location map

103 McDaniel Ave, Greenville, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.