BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Holly Springs, North Carolina. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

a right turn lane at Main Street & Holly Springs Road (called "HL-0030 Main Street Right Turn Lane") HL-0030 consists of approximately 420 LF of roadway widening along Main Street. Project will include grading, drainage, paving, curb and gutter, traffic control, pavement markings and markers, utilities, erosion control, signing, signals, and other related items as shown on the plans in accordance with these specifications and plans. All work shall be performed in accordance with the North Carolina Department of Transportation Standard Specifications for Roads and Structures dated January 2024 with all amendments and supplements. Bid security and bonding information can be found in the project documents. Each proposal shall be accompanied by a certified check or bid bond in the amount of not less than five percent (5%) of the amount of the total of the itemized bid in the form and subject to the conditions provided in the Instruction to Bidders. A Performance Bond and a Payment Bond, each in the amount of one hundred percent (100%) of the contract price for each project, with a corporate surety approved by the Town of Holly Springs, will be required for the faithful performance of the contract. Bidders shall provide certification that performance and payment bond sureties are licensed in North Carolina. Question Deadline 09/13/2024 at 5:00 PM ET Questions regarding HL-0030 Main Street Right Turn Lane should be emailed to Tyler.White@kimley-horn.com. The completion date for this contract is 365 calendar days. The liquidated damages for this contract are Two Thousand and Five Hundred Dollars ($2,500) per calendar day The Town of Holly Springs reserves the right to reject any or all bids.

Award

Roads / Highways

$776,519.00

Public - City

Paving, Site Work

168

23

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
54
Bidding Soon
1,147
All Active Projects
417
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2024

October 25, 2024

img_map_placeholder

N Main St, Holly Springs, NC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.