Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a transportation facility in San Francisco, California. Completed plans call for the renovation of a seven-story above grade transportation facility.
As of October 24, 2024, all sub-bids have been received. Turner Construction Company has broken ground on the project to install prefabricated interim passenger corridors to facilitate passenger safety and comfort. Once project is awarded, the owner will post on the SFO website. The Courtyard 4 Connector (C4C) Project is a new 7-story core-and-shell building, part of the overall Terminal 3 West (T3W) Modernization Project. The T3W Project is a continuation of the Terminal 3 (T3) Program at San Francisco International Airport (SFO), which began with renovations and expansions of Boarding Area E (BAE) and Terminal 3 East (T3E). The T3W Project will renovate the western half of Terminal 3 to the same level of passenger experience that was achieved in the other airport terminal projects. The Courtyard 4 Connector Building will be built between Terminal 3 and the International Terminal (ITB) and will include secure passenger corridors and baggage handling systems connecting T3 and ITB. Additionally, the project will consist of space for offices, assembly (passenger lounges), airport employee amenity space, Customs & Border Protection (CBP) One-Stop passenger security screening checkpoint, loading dock, rooftop mechanical penthouse, and mechanical system upgrades within the existing pump station. Level 1 of C4C is open to the airfield and apron program while levels 2 and 3 are directly connected to T3 and are considered as an extension of that building for egress and plumbing fixture provisions. Trade Package Scope Description: Provide all elevators and escalators included in the Courtyard 4 Connector Project. Turner is seeking RFQs for the following trade packages: Trade Package # C12 Trade Package Name: C4C - Elevators and Escalators Estimate: $6,000,000 CMD LBE Participation Requirement: 0% Only vendors who successfully meet the prequalification criteria and are deemed qualified to execute work in their respective scope will be invited to submit a proposal. Vendors who fail to submit the necessary prequalification information will not be considered prequalified and, consequently, will not be permitted to participate in the project. Contract documents, including drawings and specifications, for the bid package will be available for bidding Q3 of 2024. Construction scope of work is expected to start in Q1 of 2027. Completed prequalification packets are due to Turner no later than 09/12/2024. Please contact Patty Heredia, pheredia@tcco.com on how to get prequalified with Turner Construction.
Post-Bid
Transportation Terminals
$6,000,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 12, 2024
February 1, 2027
To Be Determined, San Francisco, CA
Related To This Project
San Francisco, CA
Bid Date: Sep 12 2024
San Francisco, CA
--
San Francisco, CA
Bid Date: Aug 19 2024
San Francisco, CA
Bid Date: Aug 19 2024
San Francisco, CA
Bid Date: Aug 15 2024
San Francisco, CA
Bid Date: Sep 04 2024
San Francisco, CA
--
San Francisco, CA
Bid Date: Sep 12 2024
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
Bid Date: Aug 22 2024
San Francisco, CA
Bid Date: Sep 19 2024
San Francisco, CA
Bid Date: Sep 17 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.