BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 21, 2024 at 8:00 PM

Updated May 8, 2025

Site work for a water / sewer project in Northville, Michigan. Completed plans call for site work for a water / sewer project.

As of October 21, 2024, project was awarded to Bidigare Contractors in the amount of $530,785.50. Reference Number 0000359876 Delivery Point 215 W. Main St Northville, Michigan United States 48167 The project consists of installation of approximately 1,300 lineal feet of 12-inch HDPE water main along Cady Street via directional drilling method. Question Deadline 08/22/2024 at 1:00 PM ET Questions are submitted online No Bid security shall be furnished in accordance with the Instructions to Bidders. Bid security in the form of a Bid Bond for a sum no less than five percent (5%) of the amount of the Bid will be required with each Bid. Bids shall be enclosed in sealed envelopes plainly marked with the project name and the name of the bidder. No bid may be withdrawn for a period of ninety (90) calendar days after the scheduled closing time for receipt of the Bids. The Owner reserves the right to accept any or all Bids and award the contract to other than the lowest bidder, to waive any irregularities or informalities or both; to reject any or all Bids; and in general, to make the award of the Contract in any manner deemed by the Owner, in its sole discretion, to be in the best interest of the Owner.

Award

Water / Sewer

$530,786.00

Public - City

Site Work

13

11

5

Subscribe For Documents

88 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
534
Active Projects
318
Bidding Soon
2,633
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2024

September 30, 2024

Project location map

E Cady St, Northville, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.