BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2024 at 8:00 PM

Updated September 13, 2024

Site work, paving and outdoor lighting for a mixed-use development in Fresno, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Barstow and Bond Traffic Signal. Liquidated Damages $1,500 per day for each calendar day. The DBE goal for this Project is NINETEEN PERCENT (19%). Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Project Duration 60 Working days from Notice to Proceed Date Scope of Services The scope of work includes but is not limited to: The installation of pedestrian countdown heads, APS, curb ramps, streetlights, median nose reconstruction, bicycle detection, and enhanced bicycle striping at the intersection.

Bid Results

Roads / Highways

$1,225,575.00

Public - City

Outdoor Lighting, Paving, Site Work

11

13

10

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
52
Bidding Soon
630
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2024

November 11, 2024

Project location map

Multiple Locations, Fresno, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.