BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Fresno, California. Completed plans call for site work for a playground / park / athletic field; and sidewalk / parking lot.

The scope of work includes but is not limited to; removal and replacement of existing drinking fountain(s), bleachers, and accessibility improvements at Cary Park located at 4750 North Fresno Street, Fresno, CA. The Construction Allocation for this project is $354,970.00. The work hereunder constitutes a "public work" as defined in Chapter 1, Part 7, Division 2 of the California Labor Code, and Contractor shall cause the work to be performed as a "public work" in accordance with such Chapter of the California Labor Code. The Council of the City of Fresno has adopted Resolution No. 82-297 ascertaining the general prevailing rate of per diem wages and per diem wages for holidays and overtime in the Fresno area for each craft, classification, or type of worker needed in the execution of contracts for the City. A copy of the resolution is on file at the Office of the City Clerk. Actual wage schedules are available at Capital Projects Administration Division, 747 R Street, 2nd Floor, Fresno, California 93721, (559) 621-8880. Contractors and Subcontractors must meet any and all requirements of Labor Code sections 1771.1 and 1771.5 prior to submitting bids. Bond Notes: All proposals must be made on the Bid Proposal Form provided by the Purchasing Manager. A Bid Deposit, which can be provided separately, in the amount of TEN PERCENT (10%) of the Total Net Bid Amount (or, in bids with Add Alternates, the highest possible combination of the Base Bid plus Add Alternates) in the form of a certified or cashier's check, an irrevocable letter of credit, or a certificate of deposit or a bidder's bond executed by a corporate surety, admitted by the California Insurance Commissioner to do business in California, payable and acceptable to the City of Fresno; or the Bidder shall have registered with the Purchasing Manager of the City an annual bid bond sufficient to provide coverage in such amount. All Bid Deposits will be held until a Contract has been executed with the successful Bidder or all bids have been rejected. Copies of Bid Deposits may be submitted electronically, with the exception of a certified or cashier's check, which must be brought to the Purchasing Manager's office and labeled accordingly with the bid number prior to the bid opening. A 100 percent Payment Bond and 100 percent Performance Bond for all public works contracts must be filed with the Contract Documents and approved by the City before the Contractor enters upon performance of the Work. The City of Fresno hereby notifies all Bidders that no person shall be excluded from participation in, denied any benefits of, or otherwise discriminated against in connection with the award and performance of any contract on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, ethnicity, status as a disabled veteran or veteran of the Vietnam era or on any other basis prohibited by law. No bid will be considered for award unless the Bidder at the time of bid opening, is licensed with a valid Class "A" or "B" Contractor's License issued by the State of California. The City reserves the right to reject any and all bids. Project Duration: 80 Working days from Notice to Proceed Date Liquidated Damages: $500 per day for each calendar day. Question Deadline 08/20/2024 Type of Award: Lump Sum JAMES.JACKSON2@FRESNO.GOV

Award

Playgrounds / Parks / Athletic Fields

$449,289.00

Public - City

Site Work

18

11

7

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
27
Bidding Soon
400
All Active Projects
156
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2024

September 26, 2024

img_map_placeholder

4750 N Fresno St, Fresno, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.