BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Miami Beach, Florida. Completed plans call for site work for a water / sewer project.

Sewer Pump Station (PS) 28 is owned and operated by the City of Miami Beach ("the City"). The station is located at 300 West 28th Street, Miami Beach, Florida. The PS 28 lift station collects flow from its own collection basin, and there are two upstream pump stations, PS 13 and 14. Wastewater entering the station from the gravity collection system must pass through the influent screening structure, which is located on the east side of the station. The gravity influent to the structure comes from 30-inch and 24-inch lines that enter the structure on its east side from the north and south, respectively. Flow channels divert the entering flow through a comminutor (channel grinder) prior to entering the station's wet well via a 30-inch influent line. Once in the wet well, a triplex lift station consisting of three 200 horsepower (HP) (two in operation, one standby unit) pumps sends the gravity influent into the 36-inch discharge header associated with the booster pumps. The work includes the complete rehabilitation of the pump station building and demolition and construction of a new electrical building, including but not limited to the demolition of the existing electrical building, bypass pumping, interior demolition of the pump station building, complete replacement of all pumps piping and appurtenances, install new generator and fuel tank, new odor control, new ventilation / AC (HVAC) system, improve site accessibility, electrical, plumbing, instrumentation and site work, storm proof and rehabilitate the pump station by installing watertight hatches and hurricane proof windows and doors, perform all structural and ancillary work as necessary to maintain the structural integrity and prevent water intrusion to the buildings, and the complete replacement of approximately 1,100 LF 30" DIP discharge force main via open cut. The work also includes pump optimization for energy efficiency, as feasible. The work includes the furnishing of all labor, materials, equipment, services, and incidentals necessary to complete the required work described here, including all appurtenant work, complete, tested, and ready for operation, including temporary utilities and facilities as required, all surveying work for layout construction and as-builts, all in conformance with these solicitation documents and City of Miami Beach Public Works Standards. Q & A deadline: Sep 19, 2024 5:00:00 PM EDT Questions will be allowed up to 10 days before the initial deadline for submittal of Bids. Questions must be directed to nataliadelgado@miamibeachfl.gov, with a copy to the City Clerk rafaelgranado@miamibeachfl.gov. Project Site: 300 West 28th Street, Miami Beach, Florida 33140 6 Estimated Budget: $32,321,845.00 Licensing Requirements. Bidder shall be State of Florida Certified General Contractor, with a Florida Certified Underground Utility and Excavation Subcontractor. Submittal Requirement: Provide copy of license. Liquidated Damages: 1. Failure to achieve Substantial Completion: $7,742.00 /day 2. Failure to achieve Final Completion: $7,742.00 /day

GC Bidding

Water / Sewer

$32,321,845.00

Public - City

Site Work

160

24

2

4

Subscribe For Documents

78 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
116
Bidding Soon
1,731
All Active Projects
764
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 11, 2024

December 10, 2024

img_map_placeholder

300 W 28th St, Miami Beach, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.