BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 5, 2025 at 7:00 PM

Updated November 6, 2025

Site work for a transportation facility in Shaker Heights, Ohio. Completed plans call for site work for a transportation facility.

The project is at the Greater Cleveland Regional Transit Authority's (GCRTA) along the Blue Line (Trunk Line) of the Light Rail system between Ashby Road at the west end and Avalon Road at the east end of the project in Shaker Heights, Ohio. The work involves the rehabilitation of the guardwalls and retaining wall. This project shall include all labor, material, equipment and supervision necessary to complete the job in a workmanlike manner consistent with recognized good practice and latest building codes requirements. 1. The work to be performed will be along the Blue Line (Trunk Line) of the Light Rail system between Ashby Road at the west end and Avalon Road at the east end of the project in Shaker Heights, Ohio. 2. The slopes along the rail line shall be cleared of trash and debris as well as all existing trees 4 inches in diameter and larger and shrub growth down to the level of the existing ground. In addition, all trees of all diameters shall be removed for a 5 foot width as measured from the toe of slope at track level or the top of the lower retaining wall, as shown on the plans. The limits of the clearing shall be from the top of slope along the backside of the guardwalls at the level of Van Aken Boulevard down to the top of the retaining walls or the toe of slope at railroad track level. Drainage weepholes in the retaining walls along the rail line at track level shall be cleared of debris. 3. Backfilling of rodent and/or fox burrows along the slopes of the rail line shall be performed by filling any exposed voids with backfill and seeding the area of excavation as indicated in the plans. 4. The guardwalls along Van Aken Boulevard shall have the areas of existing brick veneer removed and replaced with new cast concrete and thin brick veneer as indicated in the plans. Concrete patching shall be performed on areas of the guardwalls which have delaminated or spalled as indicated in the plans. The tree wells along the guardwalls shall have the metal grates removed, the concrete curb at the tree well and the existing trees or stumps removed. New trees shall be planted in the tree wells as indicated in the plans. 5. The retaining wall at the parking stalls along the westbound side of Van Aken Boulevard near Avalon Road shall have areas of brick veneer removed and replaced with new thin brick veneer as indicated in the plans. Concrete patching shall also be performed on areas of the retaining wall which have delaminated or spalled as indicated in the plans. The Engineer's Estimate is $1,357,287.00 and the DBE goal is FOURTEEN percent (14%) If you have any questions regarding the DBE goal, or wish to request a copy of the current list of Certified DBE firms, please contact Carl Kirkland, Office of Business Development at 216-356-3128; fax: 216-350-5298 and E-mail: ckirkland@gcrta.org Communication regarding this procurement, including requests for clarification shall be directed in writing to Jonathan Laule, NIGP-CPP, CPPB, MPA, Program Contract Manager; e-mail: jlaule@gcrta.org. (a) Bid Guarantee - equivalent to ten percent (10%) of the bid price if provided by cashier's check or money order; or one hundred percent (100%) of the contract amount if provided by bid bond. (b) Performance Bond - in the amount of one hundred percent (100%) of the contract price. (c) Payment Bond - in the amount of one hundred percent (100%) of the contract price. Substantial Completion - 210 days after Notice to Proceed - $340 Liquidated Damages/Dollars Per Day Final Completion - 240 days after Notice to Proceed - $250 Liquidated Damages/Dollars Per Day Question Deadline 10/10/2025 All questions should be put in writing to Jonathan Laule at: e-mail: jlaule@gcrta.org. Any explanation desired by a bidder regarding the meaning or interpretation of any portion of this IFB must be requested in writing and received by the GCRTA no later than ten (10) calendar days before bid submission deadline. The GCRTA may reject any bid, all bids, or the sole responsive bid, and may reject any part or parts of bids, or may waive any formality which it deems to be immaterial. The GCRTA may also cancel this solicitation at any time before or after the opening of bids. The GCRTA will not compensate any bidder for costs incurred in preparing bids or providing information required in connection therewith.

Bid Results

Transportation Terminals

$1,360,138.00

Public - City

Site Work

22

21

159

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
259
Active Projects
136
Bidding Soon
2,074
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2025

December 22, 2025

Project location map

Lee Rd & Van Aken Blvd, Shaker Heights, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.