Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Bastrop, Texas. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.
Agnes Street Extension Project. Question Deadline 08/27/2024 Please submit all questions for this Project no later through the Q&A portal. Addendums will be posted as needed so the bidders should check online the bidding time frame and prior to submitting their proposal. Anticipated time of construction is: Substantial Completion - 12 months. Bastrop Agnes Street from SH 304 to Schaefer Blvd Approximately 4000 LF of asphalt pavement, water, wastewater, and storm sewer. The City of Bastrop reserves the right to accept or reject any or all bids and to waive any informality in any bids should it consider same to be in its best interest. Bids may not be withdrawn for the period of 60 days after date of receiving bids. All bids will be evaluated on cost, experience of the contractor and the substantial and final completion times. The selected bidder will not necessarily be the low bidder. The selected bidder will be the one that provides the best value to the City at the discretion of the City and Project Team. Bids are invited for items and quantities of work as follows: Agnes Street Extension includes 1,800 LF of a two-lane roadway widening and 1,760 LF of a four-lane divided roadway consisting of the following items (quantities rounded): 2,300 TONS of HMAC, 10,000 LF of concrete curb and gutter, 1,100 SY of concrete sidewalk, 1,700 LF of storm drain ranging from 18 RCP to 6x5 RCB, 2,100 LF of water line ranging from 6 DI to 12 PVC, 700 LF of wastewater line ranging from 6 PVC to 10 PVC, and 12 street lights. Bid/Contract Documents, including Drawings and Technical Specifications are on file at Bastrop City Hall, 1311 Chestnut St, Bastrop, TX 78602.
Award
Roads / Highways
$3,246,606.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 16, 2024
November 15, 2024
Agnes St, Bastrop, TX
Related To This Project
Bastrop, TX
--
Bastrop, TX
Bid Date: Sep 05 2024
Bastrop, TX
--
Bastrop, TX
Bid Date: Oct 24 2024
Bastrop, TX
Bid Date: Oct 16 2024
Bastrop, TX
--
Bastrop, TX
--
Bastrop, TX
Bid Date: Sep 16 2024
Bastrop, TX
--
Bastrop, TX
Bid Date: Jul 31 2024
Bastrop, TX
--
Bastrop, TX
--
Bastrop, TX
Bid Date: Aug 14 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.