Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Fort Wayne, Indiana. Completed plans call for site work for a water / sewer project.
Project #2366-5342-90 Arcola Road and Drainage Improvements This work shall consist of the installation of watertight service connections on all proposed pipe that connect existing storm sewer tap connections to proposed interception tiles, as indicated on the plans. This work shall consist of the installation of inlet, yard drains, as indicated on the plans. This work shall consist of the installation of pipe, plug existing and associated work and incidentals for performing the work as indicated on the plans. This work shall consist of the construction, reconstruction, or adjustment to grade of sanitary manholes. This work shall consist of the construction of sanitary sewer laterals in accordance with the plans installed via open cut installation. This work shall consist of providing bypass pumping and/or bypass flow for the existing storm sewer as necessary to complete the work as indicated in the drawings and/or as directed by the Owner and/or Engineer. This work shall consist of the crushing or cutting open the existing pipe, filling voids and compacting with structure backfill type 1, and backfilling the resulting trenched, holes, and pits as required to complete to work as indicated in the drawings. This work shall consist of the installation of wooden fencing as shown on the plans and specified herein. The work shall consist of the installation of a toe wall for the 48" outfall at the Manier Ditch as indicated in the drawings, including an anchor strap. This work shall consist of the installation and maintenance of temporary erosion control measures as shown on the plans and specified herein. The contractor shall provide and maintain methods, equipment, and temporary construction as required to control conditions at the Site and adjacent areas. Contractor shall maintain all controls until Contractor warranty period is complete, or until controls are no longer needed, whichever is earlier. Upon completion of the Work, remove temporary controls and restore Site to specified condition; if condition is not specified, restore Site to pre-construction condition. This work shall consist of the installation and maintenance of temporary traffic control devices as show on the plans and specified herein. This work shall consist of the installation of cured-in-place pipe (CIPP) as shown on the plans and specified herein.
Award
Water / Sewer
$1,952,338.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better projects. Build better bids. Win.
Elevate your business with the top source for commercial construction data. Get instant access to Project Search, and five free projects and companies. Subscribe for complete access to all contacts and documents to unlock opportunities and start winning more business today!
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
September 10, 2024
October 10, 2024
Arcola Rd, Fort Wayne, IN
Related To This Project
Fort Wayne, IN
Bid Date: Sep 06 2024
Fort Wayne, IN
Bid Date: Oct 01 2024
Fort Wayne, IN
Bid Date: Aug 29 2024
Fort Wayne, IN
Bid Date: Sep 04 2024
Fort Wayne, IN
Bid Date: Sep 05 2024
Fort Wayne, IN
Bid Date: Sep 12 2024
Fort Wayne, IN
Bid Date: Sep 12 2024
Fort Wayne, IN
Bid Date: Aug 29 2024
Fort Wayne, IN
Bid Date: Aug 22 2024
Fort Wayne, IN
Bid Date: Sep 05 2024
Fort Wayne, IN
Bid Date: Aug 12 2024
Fort Wayne, IN
Bid Date: Sep 05 2024
Fort Wayne, IN
Bid Date: Aug 20 2024
Fort Wayne, IN
Bid Date: Aug 22 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--