Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 24, 2024 at 8:00 PM
Updated September 28, 2024
Site work for a mixed-use development in Whitingham, Vermont. Completed plans call for site work for a water / sewer project.
The Board of School Directors reserves the right to accept any bid, which it deems most favorable to the interests of the School District and to reject any and all bids or any portion of any bid, submitted which, in its opinion, is not in the best interest of the School District. The school district also reserves the right to waive any technicalities in the bid process not in the best interest of the district. Project Location: Twin Valley Middle High School, Whitingham, VT The purpose of this project is to replace the existing underground portion of the steel district heating piping connecting the wood boiler plant with the hydronic heating system in the school's boiler room. The school intends to hire one contractor to manage and execute the replacement of the piping. The contractor shall coordinate utility location, any construction stormwater requirements, and any permits that need to be pulled. All work shall be coordinated with the school with regard to scheduling. The contractor is permitted to leave in place the existing district heating piping, or to remove it as is most beneficial to proper execution of the work. The contractor shall be aware that there is an existing water line and existing electrical conduit that runs in parallel to the existing district heating piping. These utilities shall remain in place, and will need to be repaired by the contractor ifthey are impacted by the work. The work in the contract is described as follows: 1. District Heating Piping Replacement - The contractor will provide all labor, materials, consumables, and other work necessary for installation ofnew district heating piping and connecting it to existing piping in the wood energy plant and boiler room in the school. The work covers: Excavation and stormwater management :- 1) Removal of existing district heating piping as necessary for execution ofthe work a) Grouting and leaving in place any district heating piping as desired. b Underground piping supply, installation, cleaning, flushing, and hydrostatic leak testing 1) Including providing designed shop drawings from piping system vendor and supporting and restraint of underground piping system entering each building per piping system vendor requirements Connections of new underground pipe in wood energy plant and school boiler room Backfill oftrench and repair ofsurfaces and work area to original condition. 1) Includes repair of any damage to existing underground utilities that are to remain in service. Replace underground heating pipes from woodchip boiler building to boiler room of main building. Completion:- December 1, 2024.
Post-Bid
Educational
$75,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 9, 2024
October 9, 2024
4299 Vermont Rte 100, Whitingham, VT
Related To This Project
Whitingham, VT
Bid Date: Oct 23 2020
Whitingham, VT
Bid Date: Apr 11 2025
Whitingham, VT
Bid Date: Mar 14 2025
Whitingham, VT
Bid Date: Apr 14 2025
Whitingham, VT
Bid Date: Apr 14 2022
Winooski, VT
--
Franklin, VT
Bid Date: Sep 06 2024
Norwich, VT
Bid Date: Sep 03 2024
Colchester, VT
--
Newport, VT
Bid Date: Aug 28 2024
Colchester, VT
--
Craftsbury, VT
Bid Date: Aug 30 2024
Milton, VT
Bid Date: Sep 06 2024
Hardwick, VT
Bid Date: Oct 14 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
