BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Dayton, Ohio. Completed plans call for site work for a water / sewer project.

Description: Lining of a 24 water main through Kettering Field under Interstate 75 and across Vermont Avenue to Earl Avenue. This will include construction of a 24 water main in the intersection of Vermont Avenue at Earl Avenue. Approximately 1,450 linear feet of Cured in Place Pipe (CIPP) lining and 45 linear feet of 24 ductile iron pipe via open-cut will be installed. Work includes the lining and installation of pipe and fittings, gate valves, fire hydrants and performing other work incidental thereto. Site Address: Kettering Field Est. Completion Date: Sept. 30, 2025 This project consists of lining approx. 1,450 linear feet of 24" cast iron water main in Kettering Fields to cross I-75 to Earl Ave. The work includes the furnishing of all labor, tools, equipment, and materials, and performing all operations in connection with the lining of the existing water main with a continuously extruded jointless and seamless pipe liner. Please direct all technical questions to: Jane Brooks, Senior Engineer I Department of Water Engineering Phone (937) 333-3619 Fax (937) 333-6768 E-mail jane.brooks@daytonohio.gov WORK INCLUDES THE INSTALLATION OF PIPE AND FITTINGS, GATE VALVES, FIRE HYDRANTS, AND PERFORMING OTHER WORK INCIDENTAL THERETO. If you have questions regarding PEP participation or the waiver request process, please contact the Human Relations Council at (937) 333-1403. . This Project is being bid with a 5% MBE participation goal. A company must be certified as MBE for the MBE goal at the time of the bid opening and must be pre-qualified to perform the proposed subcontracted work. You are advised to obtain a copy of the company's certification letter and to review the Certification List. Goals of Minority Worker Utilization Expressed in Percentage Terms From 1/1/2000 to Present 11.5% If the Engineer determines that an interpretation or clarification is warranted, the Engineer shall issue an Addendum through the Electronic Bidding Service. Any interpretation or clarification of the Contract Documents made by any Person other than the Engineer, or in any manner other than an Addendum issued through the Electronic Bidding Service, shall not be binding and the Bidder shall not rely upon any such interpretation or clarification.

Bid Results

Water / Sewer

$1,410,303.00

Public - City

Site Work

15

5

4

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
58
Bidding Soon
1,325
All Active Projects
608
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2024

December 16, 2024

img_map_placeholder

444 N Bend Blvd, Dayton, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.