Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 29, 2024 at 8:00 PM
Updated August 30, 2024
Site work and paving for a road / highway in Hebron, Ohio. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
Services for this project include the design and preparation of construction contract plans and specifications for the reconstruction with widening and extension of Canyon Road according to the Village of Hebron collector standards as described in Title Seven of the Village of Hebron Codified Ordinances. The widening and reconstruction will extend along Canyon Road approximately 2,000' to the north of Refugee Road. The extension will provide connection from Refugee Road SE. to U.S. 40. The intersection s at Refugee Road SE. and at U.S. 40 will be upgraded accordingly. Additional enhancements include curb and gutter, drainage improvements (including regional flood control improvements), sidewalk, shared use path, ADA compliant ramps, lighting, and extensions for both the waterline and sanitary line. The design shall be funded with local municipal funds and refunded by private funds. The Construction may be funded by a combination of federal, state, local , and private funds. Prequalification Requirements DESIGN SERVICES: Bicycle Facilities and Enhancement Design Non-Complex Roadway Design Complex Right of Way Plan Development Subsurface Utility Location Services (limited utilities) Geotechnical Engineering Services Geotechnical Testing Laboratory Geotechnical Field Exploration Services Geotechnical Drilling Inspection Services Limited Lighting Design Bridge Design Level 1 The contract type will be a lump sum agreement. It is anticipated that the selected Consultant will be authorized to proceed by September 30, 2024. If the Village Council chooses to require thr ee readings for the award, the authorization will be pushed to November 1 st , with all completion dates shifting by 30 days. Right of Way Plans - May 31st , 2025 Construction Plans Prepared - August 15th , 2025 The method of Contractor Selection has not been Determined at this time.
Conceptual
Roads / Highways
$300,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 4, 2024
October 14, 2024
Canyon Rd SE, Hebron, OH
Related To This Project
Hebron, OH
--
Hebron, OH
--
Hebron, OH
--
Hebron, OH
--
Hebron, OH
Bid Date: Mar 17 2025
Hebron, OH
--
Hebron, OH
--
Hebron, OH
Bid Date: Apr 17 2025
Hebron, OH
--
Hebron, OH
--
Hebron, OH
Bid Date: Aug 21 2024
Hebron, OH
Bid Date: Aug 14 2024
Hebron, OH
Bid Date: Jun 20 2024
Hebron, OH
--
Hebron, OH
Bid Date: Feb 22 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
