BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Hebron, Ohio. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Services for this project include the design and preparation of construction contract plans and specifications for the reconstruction with widening and extension of Canyon Road according to the Village of Hebron collector standards as described in Title Seven of the Village of Hebron Codified Ordinances. The widening and reconstruction will extend along Canyon Road approximately 2,000' to the north of Refugee Road. The extension will provide connection from Refugee Road SE. to U.S. 40. The intersection s at Refugee Road SE. and at U.S. 40 will be upgraded accordingly. Additional enhancements include curb and gutter, drainage improvements (including regional flood control improvements), sidewalk, shared use path, ADA compliant ramps, lighting, and extensions for both the waterline and sanitary line. The design shall be funded with local municipal funds and refunded by private funds. The Construction may be funded by a combination of federal, state, local , and private funds. Prequalification Requirements DESIGN SERVICES: Bicycle Facilities and Enhancement Design Non-Complex Roadway Design Complex Right of Way Plan Development Subsurface Utility Location Services (limited utilities) Geotechnical Engineering Services Geotechnical Testing Laboratory Geotechnical Field Exploration Services Geotechnical Drilling Inspection Services Limited Lighting Design Bridge Design Level 1 The contract type will be a lump sum agreement. It is anticipated that the selected Consultant will be authorized to proceed by September 30, 2024. If the Village Council chooses to require thr ee readings for the award, the authorization will be pushed to November 1 st , with all completion dates shifting by 30 days. Right of Way Plans - May 31st , 2025 Construction Plans Prepared - August 15th , 2025 The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

22

7

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
40
Bidding Soon
1,027
All Active Projects
328
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2024

October 14, 2024

img_map_placeholder

Canyon Rd SE, Hebron, OH

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.