BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 24, 2024 at 8:00 PM

Updated August 19, 2025

Site work and paving for a mixed-use development in Tampa, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Counties: Hillsborough Road Name: USB 41/SR 685 - Resurfacing Limits: 10020101 Project(s): 44366515201(*) Federal Aid No: N/A Total Roadway Length: 0.785 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 0.785 Miles Contract Days: 200 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Flex Days Please read the full advertisement Description: The Improvements under this Contract consist of milling and resurfacing of SR 685 from W of N Florida Ave. to W. MLK Jr. Blvd. Additional work include: sidewalk reconstruction, minor drainage improvement, ADA upgrade, driveway reconstruction, signing and pavement markings, and signalization in Hillsborough County. Prequalification required. Question Deadline 09/04/2024 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 002 - Resurfacing, Signing/Pavement Markings, and Urban Corridor Improvements - SR 685

Award

Roads / Highways

$3,709,156.00

Public - State/Provincial

Paving, Site Work

80

9

6

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
331
Active Projects
122
Bidding Soon
2,486
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.