BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, renovation and addition to a civil project in Hutto, Texas. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and water / sewer project.

The Scope of This Work Package Consists of the Turnkey Contruction and Start-up of the Aerated Sludge Holding Basins (Area 60), Ashb Blowers (Area 62), Aerated Sludge Holding Tank (Area 64), Biosolids Handling Building (65), Less Architectural, and as Further Described Within the Package Inclusions and Exclusions. Question Deadline 09/18/2024 at 3:00 PM CT All questions about the meaning or intent of the Contract Documents shall be received in writing via online AUGUST 27th MEETING INFORMATION Join the meeting now Meeting ID: 236 985 503 30 Passcode: weYhoo Dial in by phone +1 469-620-1006,,898780486# United States, Dallas Find a local number Phone conference ID: 898 780 486# SEPTEMBER 5th MEETING INFORMATION Join the meeting now Meeting ID: 235 675 027 134 Passcode: xcbQi6 Dial in by phone +1 469-620-1006,,320047102# United States, Dallas Find a local number Phone conference ID: 320 047 102# Previously Purchased Equipment for This Package is as Follows: 40 23 46 - Slide & Sluice Gates - Rw Gate 43 22 23 - Centrifuge Equipment - Flottweg 44 42 19.2 - Multi-stage Centrifugal Blowers - Lonestar 44 42 56.52 - Progressing Cavity Pumps (Centrifuge Feed Pumps) - Nov/moyno 44 42 64 - Weirs and Baffles - Nefco Work of This Project Generally Includes Expansion of the Hutto South Wwtp. More Specifically, the Work Includes, but is Not Limited to, Construction of the Following: Facility 5, Site Civil Improvements: Facility 10, Headworks Improvements: Cast-in-place Headworks Structure With Coarse (6mm) Screening, Bypass and Grit Removal Electrical Room for Headworks Equipment Screening and Grit Collection and Storage Facility 15, Odor Control Improvements: Installation of a Bioscrubber, Ventilation Fans and Exhaust System for the Influent Lift Station, Headworks, and Primary Clarifier Facilities. Facility 16, 17 and 18, Primary Clarifier Improvements: Installation of a Primary Splitter Box and Two (2) Primary Clarifiers With Spiral Rake Sludge Collection System, Scum Pumping and Primary Solids Pumping Station. Facility 19, 20 and 30, Process Train Improvements: Installation of Two (2) Common Wall Biological Process Basins With Anaerobic, Anoxic and Aerobic (A2o) Treatment Zones. Integral Mixed Liquor Splitter Box to Distribute Flow to the Downstream Clarification Process. Installation of an Independent Process Basin Splitter Box Structure. Facility 25, Aeration Blower Improvements: Installation of a New Blower Building With Process Air Blowers and Electrical & Hvac Equipment. Facility 35 and 40, Secondary Clarifier Improvements: Installation of Two Secondary Clarifiers With Spiral Rake Sludge Collection System. Installation of a Ras/was Pump Station and Piping. Facility 45, Chemical Feed Improvements: Installation of Alum and Sodium Hypochlorite Feed and Storage Equipment. Facility 50, 55, and 70, Tertiary Treatment Improvements: Installation of Cloth Media Filters, Uv Equipment, Non-potable Water Pump Station, Post Aeration and Effluent Monitoring Facilities. These Facilities Will Be Installed in Common Wall Basins With an Attached Electrical Building to House Electrical Equipment for These Systems. Facility 60, 62, 64, and 65, Biosolids Improvements: Installation of a New Biosolids Building With Two (2) New Centrifuges, Solids Storage, Polymer Feed Facilities and Electrical Gear for the Equipment. Installation of a New Centrifuge Pump Station With Progressive Cavity Pumps to Transfer Biosolids From the Ahsb to the Biosolids Building. Conversion of the Existing Sequencing Batch Reactor System to Allow the Basins to Be Used as Aerated Sludge Holding Basins. Rehab of the Existing Aerated Sludge Holding Tank and Belt Filter Press Facilities to Improve the Performance of the Existing Gravity Thickener and Belt Filter Press. Electrical and Scada Improvements: Install Electrical Improvements as Required to Power the Facility. Install Backup Power Generators. Install New Transformers and Site Service. Install New Electrical Buildings to House Power Equipment. Install Scada Improvements. The deadline to ask questions is 9/18/2024 3:00 PM CDT

Post-Bid

Water / Sewer

$300,000.00

Public - City

Addition, Demolition, Renovation, Site Work

1033

116

58

3

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
40
Bidding Soon
2,243
All Active Projects
860
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2024

October 28, 2024

img_map_placeholder

10710 FM1660, Hutto, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.