BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Cape Coral, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

ADA Ramp and MAT Improvements Question Deadline 08/29/2024 at 3:00 PM ET all questions must be submitted through Ion Wave at https://capecoral.ionwave.net and received by stated time NO QUESTIONS WILL BE ACCEPTED AFTER that time Cape Coral is the 8th largest city by population and the 3rd largest by land mass in Florida. Cape Coral currently has a population of more than 200,000 residents and is experiencing high growth. As a pre-platted community, Cape Coral could have more than 360,000 residents at buildout. The city has a sub-tropical lifestyle with thousands of waterfront residential properties on almost 400 miles of canals. About two-thirds of these canals provide boaters with direct access to the Gulf of Mexico. The contractor is to furnish all labor, materials, equipment, and operations necessary to complete the following work for select improvements to existing sidewalk curb ramps along local and major roadways in the Southeast area of Cape Coral (see Exhibit A map of Ramp replacement and Improvement Locations) to bring ramps to compliance with ADA, FHWA, and FDOT requirements and standards. In addition to other items, as outlined in the specifications and bid documents, the operations may consist, but shall not necessarily be limited to all or part of the following: Removal & Placement of concrete sidewalks, curb ramps, curbs and gutters, and detectable warning devices. All maintenance of traffic. Readjustment of inlets and other affected structures or utilities. Delivery of material to site (hauling). Street sweeping, as necessary, & final clean-up of job site and repair of any damage caused by construction activities including paving damaged areas per enclosed details. Sod placement.

Award

Sidewalks / Parking Lot

$192,000.00

Public - City

Paving, Site Work

24

9

2

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
14
Bidding Soon
438
All Active Projects
155
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2024

October 21, 2024

img_map_placeholder

Multiple Locations, Cape Coral, FL

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.