BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a water / sewer project in Mesquite, Texas. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Construction Manager at Risk South Mesquite Creek (CMAR) Regional Wastewater Treatment Plant Project Bid Package 6 - Electrical Building No. 3. Proposer shall provide a letter from the Proposer's Surety stating the Surety is familiar with the project and the Proposer is approved for securing 100% Performance and Payment Bonds for the price submitted for the project. Kleinfelder Project No.: 20212278.001A, 20212278.001A/DFW21R122993 Estimate: $15,000,000. After expiration of the time and date above first written, said sealed proposals will be opened to identify Proposer firms only and read according to State law in Jobsite Conference Room. It is the sole responsibility of the Proposer to ensure that his proposal is in the hands of the designated person, Geleany Morales, before the time and date above first written. It shall be each Proposer's sole responsibility to inspect the site of the work regarding the local conditions under which the work is to be done. It shall be understood and agreed that all such factors have been thoroughly investigated and considered in the preparation of the proposal submitted. Scope Construction of Electrical Building No. 3 and USA/USB Substation Pad at the South Mesquite Creek Regional Wastewater Treatment Plant project #525. Scope also includes selective civil and electrical demolition. Question Deadline 09/09/2024 at 2:00 PM CT The deadline to ask questions at online. CMAR and Owner reserve the right to reject any and all Proposals and waive any and all formalities, and the right to disregard all nonconforming or conditional Proposals or counter proposals. Project Overview a. South Mesquite Creek WWTP Peak Flow & Expansion i. Phase 1A (Early Work) - Early Peak Flow Relief Components ii. Phase 1C (Early Work) - Peak Flow Management Components 1. Headworks #2 2. Peak Flow Basin #1 3. Force mains & piping. iii. Phase 1D (This Package) - Remaining Peak Flow Management Components 1. USA/USB Construction iv. Phase 1E (Future Work) - Dual 42" Force Main v. Phase 2 (Future Work) - Peak Flow Expansion Components 1. USA/USB Improvements 2. Primary Clarifier 3. Aeration Basins 4. RAS/WAS Pump Station 5. Tertiary Filters 6. UV Disinfection 7. Non-Potable Water Improvements 8. Dewatering Equipment b. Package 6 - Electrical Building No. 3 Detailed Components i. Site Paving and Grading ii. Yard Piping iii. Electrical Building No.3 Facility iv. Substation USA Demolition v. Substation USA Replacement vi. Substation USB Demolition vii. Substation USB Replacement viii. Instrumentation and Controls ix. Fiber Optic Installation Project no- 4200252.02

Post-Bid

Water / Sewer

$15,000,000.00

Public - City

New Construction, Site Work

134

28

5

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
371
Active Projects
216
Bidding Soon
5,084
All Active Projects
1,938
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 12, 2024

May 12, 2025

May 27, 2027

img_map_placeholder

3500 Lawson Rd, Mesquite, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.