BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 4, 2025 at 8:00 PM

Updated August 13, 2025

Site work and paving for a road / highway in Queen Creek, Arizona. Completed plans call for site work for a road / highway.

https://azbex.com/local-projects/arizona-projects-08-01-25/ Completions 7. Achen-Gardner Construction has completed the Crismon Road widening project for the Town of Queen Creek. The $7.5M CMAR project included a new collector roundabout at Crismon and Cloud roads and a half-mile roadway extension to improve safety, traffic flow and access to Crismon High School. Ardurra served as design engineer. The project was completed ahead of schedule to accommodate the start of the school year. _________________________________ as if June 9,2025, construction is underway. The owner has selected a Construction Manager. A timeline for construction has not yet been established. It is the Town of Queen Creek's intent to enter into a preconstruction services and construction services contract with a qualified construction manager/general contractor to construct CIP Project Number A1005 - Crismon Road Widening - Riggs Rd to Cloud Rd, in two separate phases. Question Deadline 09/10/2024 at 5:00 PM MT Any question related to this Request for Qualifications (RFQ) shall be via the Town of Queen Creek e-Procurement Portal online. Phase 2 Will Include Constructing the Western Half Street of Crismon Rd., Approximately One-quarter Mile From the Existing Roundabout, Northerly to Cloud Road. The Proposed Alignment Will Impact an Existing Irrigation Ditch and Cross the Easement of the United States Bureau of Reclamation's (USBOR). The Irrigation Ditch is Operated by the Queen Creek Irrigation District (QCID). Phase 3 Will Include the Construction of a New Roundabout at Crismon and Cloud Roads. The Contractor Will Be Expected to Construct the Roundabout While Minimally Impacting Local Traffic as It Abuts to an Existing Subdivision, Town Owned Water Facilities, Agricultural Fields and Local Collector Traffic Along Cloud Road and the North Leg of Crismon Road, North of Cloud Road. The construction of the roundabout will also be affected by the QCID in conjunction with Phase 2. All final construction contracts that may arise from this solicitation will be guaranteed maximum price ("GMP") contracts. The Town of Queen Creek Reserves the Right to Accept or Reject Any or All Responses and to Waive Informalities.

Occupancy

Roads / Highways

$800,000.00

Public - City

Paving, Site Work

3

8

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
1
Bidding Soon
727
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2024

January 17, 2025

Project location map

S Crismon Rd, Queen Creek, AZ


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.